[Cites 0, Cited by 0] [Section 7(2)] [Section 7] [Entire Act]

Union of India - Subsection

Section 7(2)(i) in Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2014

(i)In case schedule of a seller, in a time block, is less than or equal to 400 MW, under-injection / over-injection in a time-block shall not exceed 48 MW, when grid frequency is [49.85 Hz and above and below 50.05 Hz] [Substituted '49.70 Hz and above and below 50.10 Hz' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]