Section 34 in Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019

34. Interest on Working Capital.

(1)The working capital shall cover:
(a)For Coal-based/lignite-fired thermal generating stations:
(i)Cost of coal or lignite and limestone towards stock, if applicable, for 10 days for pit-head generating stations and 20 days for non-pit-head generating stations for generation corresponding to the normative annual plant availability factor or the maximum coal/lignite stock storage capacity whichever is lower;
(ii)Advance payment for 30 days towards cost of coal or lignite and limestone for generation corresponding to the normative annual plant availability factor;
(iii)Cost of secondary fuel oil for two months for generation corresponding to the normative annual plant availability factor, and in case of use of more than one secondary fuel oil, cost of fuel oil stock for the main secondary fuel oil;
(iv)Maintenance spares @ 20% of operation and maintenance expenses including water charges and security expenses;
(v)Receivables equivalent to 45 days of capacity charge and energy charge for sale of electricity calculated on the normative annual plant availability factor; and
(vi)Operation and maintenance expenses, including water charges and security expenses, for one month.
(b)For Open-cycle Gas Turbine/Combined Cycle thermal generating stations:
(i)Fuel cost for 30 days corresponding to the normative annual plant availability factor, duly taking into account mode of operation of the generating station on gas fuel and liquid fuel;
(ii)Liquid fuel stock for 15 days corresponding to the normative annual plant availability factor, and in case of use of more than one liquid fuel, cost of main liquid fuel duly taking into account mode of operation of the generating stations of gas fuel and liquid fuel;
(iii)Maintenance spares @ 30% of operation and maintenance expenses including water charges and security expenses;
(iv)Receivables equivalent to 45 days of capacity charge and energy charge for sale of electricity calculated on normative plant availability factor, duly taking into account mode of operation of the generating station on gas fuel and liquid fuel; and
(v)Operation and maintenance expenses, including water charges and security expenses, for one month.
(c)For Hydro Generating Station (including Pumped Storage Hydro Generating Station) and Transmission System:
(i)Receivables equivalent to 45 days of annual fixed cost;
(ii)Maintenance spares @ 15% of operation and maintenance expenses including security expenses; and
(iii)Operation and maintenance expenses, including security expenses for one month.
(2)The cost of fuel in cases covered under sub-clauses (a) and (b) of clause (1) of this Regulation shall be based on the landed fuel cost (taking into account normative transit and handling losses in terms of Regulation 39 of these regulations) by the generating station and gross calorific value of the fuel as per actual weighted average for the third quarter of preceding financial year in case of each financial year for which tariff is to be determined:Provided that in case of new generating station, the cost of fuel for the first financial year shall be considered based on landed fuel cost (taking into account normative transit and handling losses in terms of Regulation 39 of these regulations) and gross calorific value of the fuel as per actual weighted average for three months, as used for infirm power, preceding date of commercial operation for which tariff is to be determined.
(3)Rate of interest on working capital shall be on normative basis and shall be considered as the bank rate as on 1.4.2019 or as on 1st April of the year during the tariff period 2019-24 in which the generating station or a unit thereof or the transmission system including communication system or element thereof, as the case may be, is declared under commercial operation, whichever is later:Provided that in case of truing-up, the rate of interest on working capital shall be considered at bank rate as on 1st April of each of the financial year during the tariff period 2019-24.
(4)Interest on working capital shall be payable on normative basis notwithstanding that the generating company or the transmission licensee has not taken loan for working capital from any outside agency.