[Cites 0, Cited by 0] [Section 10] [Entire Act]

State of Madhya Pradesh - Subsection

Section 10(2) in Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff determination of energy from Renewable Energy Sources) Regulations, 2017

(2)Wind power generation plants where the sum of generation capacity of such plants connected at the connection point to the transmission or distribution system is 10 MW and above and connection point is 33 KV and above shall be subjected to scheduling and despatch code as specified under Indian Electricity Grid Code (IEGC) -2010, as amended from time to time.