Section 2(1)(c) in Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010
(c)[ 'Approved Injection' means the injection in MW computed by the Implementing Agency for each Application Period on the basis of maximum injection made during the corresponding Application Periods of last three (3) years and validated by the Validation Committee for the DICs at the ex-bus of the generators or any other injection point of the DICs into the ISTS, and taking into account the generation data submitted by the DICs incorporating total injection into the grid: [Substituted by Notification No. L-1/44/2010-CERC, dated 1.4.2015 (w.e.f. 15.6.2010).]