State of Rajasthan - Subsection

Section 9(1)(b) in Rajasthan Electricity Regulatory Commission (tariff for Captive Power Plants) Regulations, 2007

(b)The Commission shall specify from time to time the 'Grid connectivity charges' to be applicable for parallel operation of the CPP with the grid separately.