Section 30 in Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff determination of energy from Renewable Energy Sources) Regulations, 2017
30. Plant Load Factor.
- The Plant Load Factor for the purpose of determination of Tariff shall be:| (a) During thefirst year of operation: | 65% |
| (b) From 2nd Year onwards | 80% |