Section 11 in Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2014

11. Exemptions.

- 11.1 Nothing contained in these Regulations shall apply where, in the opinion of the Commission, the Distribution Licensee is prevented from meeting his obligations under these Regulations by-(i)force majeure events such as cyclone, floods, storm, war, mutiny, civil commotion, riots, lightning, earthquake, lockout, fire affecting licensee's installations and activities;(ii)outages due to generation failure or transmission network failure;(iii)outages that are initiated by the National Load Despatch Centre/Regional Load Despatch Centre/State Load Despatch Centre during the occurrence of failure of their facilities;(iv)or other occurrences beyond the control of the Distribution Licensee:Provided that the Distribution Licensee shall not be excused from failure to maintain the standards of performance under these Regulations, where such failure can be attributed to negligence or deficiency or lack of preventive maintenance of the distribution system or failure to take reasonable precaution on the part of the Distribution Licensee.
11.2The Commission may, by general or special order, exempt the Distribution Licensee from any or all of the standards specified in these Regulations for such period as may be specified in the said Order.