Section 5(4)(Qp) in Rajasthan Electricity Regulatory Commission (tariff for Captive Power Plants) Regulations, 2007
(Qp)n = Normative Quantity of primary fuel required for generation of one kWh of electricity at generator terminals in kg and shall be computed on the basis of normative gross Station Heat Rate (less heat contributed by secondary fuel oil for coal/lignite based generating stations) and gross calorific value of coal/lignite as fired.