[Cites 0, Cited by 0] [Section 15] [Entire Act]

State of Tamilnadu - Subsection

Section 15(6) in Tamil Nadu Electricity Regulatory Commission Tamil Nadu Electricity Distribution Code

(6)Demand Management / Load Shedding: On getting directions from the SLDC rolling blackouts for short duration shall be carried out by the Licensees to maintain the load generation balance and security of the network. This may also be necessary due to the loss of any circuit, equipment or any other operational contingency that may occur in their Distribution Networks also. The Licensee shall estimate the loads that may be shed in discrete blocks at each interconnection point after consultation with the consumers if possible and submit the same to the SLDC. The consumers shall cooperate with the Licensee in this regard. The Licensee shall work out the modalities of the load shedding. A detailed procedure shall also be furnished to the SLDC and other officials in charge of the downstream substations of the Licensee, where such load shedding / rolling blackout are to be carried out. When provisions are available for the automatic load shedding with the aid of under frequency relays, the circuits involved and the quantum of load to be shed shall be intimated to the SLDC and [officials] [Substituted for the expression 'officials persons ' as per Commission's Notification No. TNERC/DC/8-8 dated 8.2.2008 (w.e.f. 27.2.2008)] in charge of downstream substations of the Licensee. The settings adopted for the UF relays shall also be furnished. If any constraint or bottleneck in the transmission system and/or distribution system, warrants rotational load shedding then it shall be resorted to by the Licensees in their distribution system. On such occasions, the public shall be promptly informed of such arrangements through the media. [Consumers] [Substituted for the expression 'Large consumers' as per Commission's Notification No. TNERC[DC/8-8 dated 8.2.2008 (w.e.f. 27.2.2008)] with [contracted demand] [Substituted for the expression 'contract demands' as per Commission's Notification No. TNERC/DC/8-8 dated 8.2.2008 (w.e.f. 27.2.2008)] of 1 MW and above and essential services such as hospital, public water works etc, shall be notified through telephone/ fax/ e-mail or any other communication systems.