Section 17(a) in Bihar Electricity Regulatory Commission (Multi Year Distribution Tariff) Regulations, 2015

(a)During the study, meters shall be installed at input points of the feeder at the sub-station and based on the load flow study the technical loss of the feeder will be evaluated.