Section 10C(3) in Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011
(3)The works carried out with any other grant of similar nature or such amount received without any obligation to return the same and with no interest costs attached to such subvention shall also be classified as works performed through consumer contribution, deposit work, capital subsidy or grant.