State of Himachal Pradesh - Section

Section 28 in Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011

(28)"project" means a hydro generating station and includes the complete hydro power generating facility covering all components such as dam, intake, water conductor system, power generating station and generating units of the scheme as apportioned to power generation;[(28-a) "prudence check" shall mean scrutiny of the reasonableness of expenditure incurred or proposed to be incurred, financing plan, use of efficient technology, cost and time over-run and such other factors as may be considered appropriate by the Commission for determination of tariff;] [Inserted by Notification No. HPERC-F(1)-2/2018, dated 22.11.2018 (w.e.f. 1.4.2011).]