Section 7(8) in Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2014

(8)The additional Charge for Deviation for over-drawals and under-injection of electricity for each time block when grid frequency is [below 49.85 Hz] [Substituted 'below 49.70 Hz' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).] shall be as specified by the Commission as a percentage of the charges for the Deviation corresponding to average grid frequency of the time block with due consideration to the behaviour of the buyers and sellers towards grid discipline:Provided that the Commission may specify different rates for Additional Charges for Deviation for over drawls and under injections and for different ranges of frequencies [below 49.85 Hz] [Substituted 'below 49.70 Hz' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).].