[Cites 0, Cited by 0]
[Section 9]
[Entire Act]
Union of India - Subsection
Section 9(2) in The Petroleum and Natural Gas Regulatory Board (Technical Standards and Specifications including Safety Standards for City or Local Natural Gas Distribution Networks) Regulations, 2008
| Sr. No. | Critical infrastructure/ activity/ processes | Time period for implementation | Implementation plan |
| 1 | Pressure reduction skid CGS (active/ monitor combination)with a minimum 50% redundancy including slam shut valve for overpressure protection and creep relief valves. | 1 year | Modification of CGS skid |
| 2 | On line odorisation equipment designed to minimize fugitiveemissions during loading, operation and maintenance. | 1 year | Automated odorisation systems to be used |
| 3 | Height of the vent shall be minimum 3 meters above workinglevel | 6 months | Increase height of vent |
| 4 | Gas detectors shall be installed at critical locations | 1 year | Install gas detectors in the CGS and District PressureRegulating Station. |
| 5 | Pressure reduction for DRS (active/ monitor combination) skidwith minimum 50% redundancy including two safety devices at leastone of them shall be a slam shut valve for over pressureprotection/under-pressure and inlet and outlet isolation valves. | 2 years | Modification/ replacement |
| 6 | Steel reinforced rubber hose conforming to IS 9573 Type IV | 6 months * | Replacement of all rubber hoses @ fifty thousand per year |
| 7 | Pipeline test record and joint radiography and cover in theform of pipe book | 3 months | Can be submitted in stages |
| 8 | HSSE Management System | 6 months | To be implemented |
| 9 | Emergency Response Plan, Disaster Management Plan and writtenemergency procedures. Also, provide for an Emergency ControlRoom, manned round the clock and equipped with effectivecommunication system and emergency vehicles fitted withcommunication facilities, first aid equipment, fireextinguishers, gas detectors, repair kits and tools, maps, plans,material safety data sheets etc. at its disposal. | 6 months | To be implemented |