Union of India - Act
The Petroleum and Natural Gas Regulatory Board (Technical Standards and Specifications including Safety Standards for City or Local Natural Gas Distribution Networks) Regulations, 2008
UNION OF INDIA
India
India
The Petroleum and Natural Gas Regulatory Board (Technical Standards and Specifications including Safety Standards for City or Local Natural Gas Distribution Networks) Regulations, 2008
Rule THE-PETROLEUM-AND-NATURAL-GAS-REGULATORY-BOARD-TECHNICAL-STANDARDS-AND-SPECIFICATIONS-INCLUDING-SAFETY-STANDARDS-FOR-CITY-OR-LOCAL-NATURAL-GAS-DISTRIBUTION-NETWORKS-REGULATIONS-2008 of 2008
- Published on 27 August 2008
- Commenced on 27 August 2008
- [This is the version of this document from 27 August 2008.]
- [Note: The original publication document is not available and this content could not be verified.]
1. Short title and commencement.
2. Definitions.
3. Application.
- Definitions, design, materials and equipment, welding, fabrication, installation, testing, operation and maintenance and corrosion control of CGD network shall be in accordance with requirements of ASME B31.8 except insofar as such requirements are specifically cancelled, replaced or modified by the requirements specified in these regulations.4. Scope.
5. Intent.
6. The standard.
- Technical standards and specifications including safety standards (hereinafter referred to as standards) for city or local natural gas distribution networks are as specified in Schedule-I which cover material and equipment (Schedule-1A), welding (Schedule-1B), piping system components and fabrication (Schedule-1C), design, installation and testing (Schedule-1D), operating and maintenance procedures (Schedule-1E), corrosion control (Schedule-1F) and miscellaneous (Schedule-1G).7. Default and consequences.
8. Requirements under other statutes.
- It shall be necessary to comply with all statutory rules, regulations and Acts in force as applicable and requisite approvals shall be obtained from the relevant competent authorities for the CGD network.9. Miscellaneous.
| Sr. No. | Critical infrastructure/ activity/ processes | Time period for implementation | Implementation plan |
| 1 | Pressure reduction skid CGS (active/ monitor combination)with a minimum 50% redundancy including slam shut valve for overpressure protection and creep relief valves. | 1 year | Modification of CGS skid |
| 2 | On line odorisation equipment designed to minimize fugitiveemissions during loading, operation and maintenance. | 1 year | Automated odorisation systems to be used |
| 3 | Height of the vent shall be minimum 3 meters above workinglevel | 6 months | Increase height of vent |
| 4 | Gas detectors shall be installed at critical locations | 1 year | Install gas detectors in the CGS and District PressureRegulating Station. |
| 5 | Pressure reduction for DRS (active/ monitor combination) skidwith minimum 50% redundancy including two safety devices at leastone of them shall be a slam shut valve for over pressureprotection/under-pressure and inlet and outlet isolation valves. | 2 years | Modification/ replacement |
| 6 | Steel reinforced rubber hose conforming to IS 9573 Type IV | 6 months * | Replacement of all rubber hoses @ fifty thousand per year |
| 7 | Pipeline test record and joint radiography and cover in theform of pipe book | 3 months | Can be submitted in stages |
| 8 | HSSE Management System | 6 months | To be implemented |
| 9 | Emergency Response Plan, Disaster Management Plan and writtenemergency procedures. Also, provide for an Emergency ControlRoom, manned round the clock and equipped with effectivecommunication system and emergency vehicles fitted withcommunication facilities, first aid equipment, fireextinguishers, gas detectors, repair kits and tools, maps, plans,material safety data sheets etc. at its disposal. | 6 months | To be implemented |