Section 7(3)(xiv) in Tamil Nadu Electricity Grid Code, 2005
(xiv)Procedures shall be developed by SLDC in consultation with STU, to recover from partial / total collapse of the Grid and periodically updated in accordance with the requirements given under Code 7 (5) (f). These procedures shall be followed by all the entities to ensure consistent, reliable and quick restoration.