State of Andhra Pradesh - Section

Section 5 in Andhra Pradesh Electricity Regulatory Commission (Interim Balancing and Settlement Code) Regulation, 2006

5. Allocation of Capacity by OA Generators.

- 5.1 The sum total of the Capacity allocations by an OA Generator for any time block to all the Scheduled Consumers and OA Consumers shall not exceed the available capacity from his generating plant being not higher than the installed capacity or contracted Open Access capacity, whichever is lower.
5.2The OA Generator shall also indicate the allocated capacity in kW at the exit point(s) for each consumer in the Format at Appendix - 1 (a) using the loss levels as specified in the applicable Tariff Order of the Commission. The energy account of the billing month shall be finalized based on the transmission and distribution losses specified by the Commission in the applicable Tariff Order.
5.3The SLDC/DISCOM shall verify the capacity allocated at the Exit point(s) and correct it in case of discrepancy, if any. The computations of SLDC shall be final and binding on all.