Union of India - Subsection

Section 7(1)(c) in Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010

(c)The dedicated transmission lines constructed, owned and operated by the ISTS Licensees shall be considered to be a part of the Basic Network. Dedicated lines constructed, owned and operated by the generator shall not be considered Page 8 of 42 as a part of the Basic Network. In the latter case, the generator will be deemed to be connected directly to the ISTS;