Section 8(2) in Punjab State Electricity Regulatory Commission (Open Access) Regulations, 2005

(2)The short-term Open Access shall be ordinarily allowed, if request can be accommodated without jeopardising the safety of the grid system by utilising :
(a)Inherent Design Margins;
(b)Margins available due to variation in power flows; and
(c)Margins available due to in-built spare.transmission/distribution capacity created to cater to future load growth.