[Cites 0, Cited by 0] [Section 20] [Entire Act]

Union of India - Subsection

Section 20(e) in Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019" (hereinafter referred to as "Net Metering Regulations, 2019")

(e)If found technically feasible, the Distribution Licensee shall, within 7 working days of the completion of the feasibility study, convey its approval for installing the Solar Project. The approval shall indicate the maximum permissible capacity of the Project, and shall be valid for a period of 4 months from the date of approval, or such extended period as may be agreed to by the Distribution Licensee.