Section 2(1)(c) in Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2014

(c)'actual injection' in a time-block means electricity generated or supplied by the seller, as the case may be, measured by the Interface meters;
(ca)[ Area Clearing Price (ACP)' means the price of a time block electricity contract established on the Power Exchange after considering all valid purchase and sale bids in particular area(s) after market splitting, i.e. dividing the market across constrained transmission corridor(s).] [Added by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]