Section 40(1)(a) in The Bangalore Metro Railway (Opening of Public Carriage for Passengers) Rules, 2011
(a)formal approval to the design and layout of all high voltage equipment including sub-stations, transmission line, power distribution system, DC feeders and third rail equipment;