[Cites 0, Cited by 0] [Section 60] [Entire Act]

Union of India - Subsection

Section 60(1) in The Oil Mines Regulations, 2017

(1)The owner, agent or manager of a mine shall ensure that prior to the commencement of drill stem test-
(a)pressure test and function test of the blowout preventer assembly is conducted;
(b)fire-fighting equipment is kept readily available for immediate use;
(c)no person other than those required for the test is admitted on the drilling floor;
(d)the test line is securely anchored at each end and at each nine metre interval;
(e)thekelly hose is not used as part of the test line; and
(f)the test line and valves are examined by a competent person and no test is conducted if any defect is discovered until such defect is rectified.