Section 20(6)(ii) in The Bangalore Metro Railway (General) Rules, 2011
(ii)the crank handle used to manually operate the points is interlocked through a key which, when released by Operations Control Center controller or Station Controller, shall inhibit setting of routs over the points concerned, and such transfer of control should be acknowledged by the station controller before the local control can be activated;