Section 25(1)(i) in Bihar Electricity Regulatory Commission (Standards of Performance of Distribution Licensee) Regulations, 2006
(i)Release of new connections/ Additional Load/Temporary Connection - All cases (100%) of release of new connection, additional load and temporary connection on application by the applicant/consumer should be resolved within specified time limits.