Section 27(2)(g) in The Bangalore Metro Railway (Opening of Public Carriage for Passengers) Rules, 2011
(g)a copy of the instructions jointly approved by Director-in-charge of Operation and Director-in-charge of Signal and Telecommunication, to be issued for operation of the equipment by the Operating Staff, including those instructions for working under abnormal or failure conditions;