Supreme Court - Daily Orders

Anjali Rathi vs Today Homes And Ifrastructure Private ... on 8 September, 2021

Bench: D.Y. Chandrachud, Vikram Nath, Hima Kohli

                                                                                 Reportable

                             IN THE SUPREME COURT OF INDIA
                         EXTRAORDINARY/APPELLATE JURISDICTION


                                    SLP (C) No. 12150 of 2019


     Anjali Rathi and Others                                        .... Petitioner(s)


                                             Versus

     Today Homes & Infrastructure Pvt. Ltd. and Others              .... Respondent(s)


                                               With

                                Civil Appeal Nos.5231-38 of 2019

     Anjali Rathi & Etc.                                            .... Appellant(s)


                                             Versus

     Today Homes & Infrastructure Pvt. Ltd.                        .... Respondent(s)

                                               With

                                 SLP (C) No.___________of 2021
                         (Arising out of SLP (C) Diary No. 45043 of 2019)


     Varun Gupta and Others                                         .... Petitioner(s)


                                             Versus

     Today Homes & Infrastructure Pvt. Ltd.                        .... Respondent(s)
     and Another
Signature Not Verified

Digitally signed by
Chetan Kumar
Date: 2021.09.15
                                                1
16:54:51 IST
Reason:
                                            JUDGMENT


Dr Dhananjaya Y Chandrachud, J


1       The petitioners are home buyers in a group housing project, Canary Greens in

Sector 73, Gurgaon, being developed by the first respondent. Home buyer agreements

were entered into between the eleven petitioners and the first respondent. Clause 21 of

the agreements envisaged that possession of the apartments would be delivered within

a period of thirty-six months, which in almost all cases was to be in 2014.


2       The grievance of the petitioners is that the project was abandoned by the

developer. As a result, they instituted proceedings 1 before the National Consumer

Dispute Redressal Commission2 seeking refund of their moneys with interest. On 12

July 2018, the NCDRC allowed their claim by directing the first respondent to refund the

principal amount paid by the petitioners together with 12 per cent interest from the date

of deposit along with costs within four weeks. There was a provision in the order for

interest being enhanced to 14 per cent if the amount was not paid within the stipulated

period. This order of the NCDRC has attained finality.


3       Execution proceedings3 under Sections 25 and 27 of the Consumer Protection

Act 19864 were instituted by the petitioners. The NCDRC issued notice on 7 September

2018. In the meantime, certain orders were passed by the NCDRC on 23 October 2018

1 Consumer Complaint Nos 1242, 1243, 1245, 1246, 1248, 1249, 1250 and 1251 of 2017
2 “NCDRC”
3 EA Nos 158, 159, 161-162, 164-166 and 168 of 2018
4 “COPRA”

                                                       2
in separate execution proceedings pertaining to other home buyers in the same housing

project. The first respondent challenged this order of the NCDRC before the High Court

of Delhi5, and by an order dated 19 November 2018, the order of the NCDRC dated 23

October 2018 was stayed by the Delhi High Court.


4      The execution proceedings initiated by the petitioners were adjourned by the

NCDRC on 13, 25 and 26 February 2019. Certain settlement terms were offered by the

judgment debtor on 27 February 2019, which were not acceptable to the decree

holders. On 5 March 2019, the proceedings were again adjourned to explore the

proposals furnished by the first respondent. Eventually, on 11 March 2019, since no

settlement was arrived at, the Managing Director of the first respondent was directed to

appear personally. The first respondent filed a petition6 before the Delhi High Court to

challenge the order of the NCDRC requiring the personal presence of the Managing

Director. By an order dated 27 March 2019, the Delhi High Court issued notice to the

petitioners and also issued a direction that no coercive steps shall be taken against the

Managing Director of the first respondent in terms of the order dated 11 March 2019

passed by the NCDRC. That has given rise to the first in the batch of Special Leave

Petitions before this Court, namely, SLP (C) No 12150 of 2019.


5      On 1 April 2019, the NCDRC passed a further order in the course of the

execution proceedings. Paragraph 14 of the order is extracted below:




5 CM(M) No 1391 of 2018
6 CM(M) No 494 of 2018

                                           3
                “As the Judgment Debtor has failed to refund the entire amount as
                directed by this Commission in its order dated 12th July, 2018, we
                direct the Judgement Debtor to refund the entire amount along with
                interest and costs in terms of the order dated 12th July, 2018 within
                two weeks from today failing which Mr. Ajay Sood, Director, shall be
                taken into custody and all the properties of the Judgment Debtor and
                the personal properties of the Judgment Debtor shall be attached
                and the decretal amount shall be recovered from it. However, this
                order of taking into custody and attachment of property shall be
                given effect into only after the Hon'ble Delhi High Court decides
                the matter.”

                                                               (emphasis supplied)



Thus, the execution applications were disposed of. The order of the NCDRC has

resulted in the filing of appeals before this Court, being Civil Appeal Nos 5231-5238 of

2019, by the petitioners/appellants for the limited purpose of challenging the final

direction of the NCDRC, i.e., that order of custody of the Managing Director of the first

respondent and attachment of properties of the first respondent shall only be given

effect to once the Delhi High Court decides the first respondent’s petition.


6       During the pendency of the proceedings before this Court, arising out of the order

of the Delhi High Court, certain developments took place. On 1 July 2019, notice was

issued in SLP (C) No 12150 of 2019 and the order of the Delhi High Court was stayed.

On 11 September 2019, the Court was informed that seven petitioners have settled

their dispute and that a settlement with the others was likely.


7       In the meantime, on 31 October 2019, proceedings were initiated against the first

respondent before the National Company Law Tribunal7 under Section 9 of the


7 “NCLT”/“Adjudicating Authority”

                                                   4
Insolvency and Bankruptcy Code 20168 by an operational creditor. The Adjudicating

Authority admitted the petition, following which the corporate insolvency resolution

process9 was initiated and a moratorium was declared under Section 14 of the IBC. The

specific direction of the NCLT was as follows:

              “15. In the given facts and circumstances, the Operational Creditor
              has established the default on the part of Corporate Debtor in
              payment of the operational debt. The Petition filed under Section 9
              fulfills all the requirements of law. Therefore, the petition is admitted
              in terms of Section 9(5) of the IBC. Accordingly, the CIRP is initiated
              and moratorium is declared in terms of Section 14 of the Code. As a
              necessary consequence of the moratorium in terms of Section 14(1)
              (a), (b), (c) & (d), the following prohibitions are imposed, which must
              be followed by all and sundry:

              "(a) The institution of suits or continuation of pending suits or
              proceedings against the corporate debtor including execution of any
              judgment, decree or order in any court of law, tribunal, arbitration
              panel or other authority;

              (b) Transferring, encumbering, alienating or disposing of by the
              corporate debtor any of its assets or any legal right or beneficial
              interest therein;

              (c) Any action to foreclose, recover or enforce any security interest
              created by the corporate debtor in respect of its property including
              any action under the Securitization and Reconstruction of Financial
              Assets and Enforcement of Security Interest Act, 2002;

              (d) The recovery of any property by an owner or lessor, where such
              property is occupied by or in the possession of the corporate
              debtor."”



This order of the NCLT resulted in the filing of a Special Leave Petition before this

Court, being SLP (C) Diary No 45043 of 2019 by certain other homebuyers. The

grievance raised in this petition is that the application filed for the initiation of corporate

8 “IBC”
9 “CIRP”

                                                    5
insolvency against the first respondent was merely to stall the refund of the amount

due to the homebuyers, in terms of the order of the NCDRC dated 12 July 2018.


8      Thereafter,   the   petitioners   lodged   their   claims   before   the   Resolution

Professional10, though without prejudice to their contentions in the proceedings pending

before this Court. The RP issued an Information Memorandum to prospective

Resolution Applicants in terms of the IBC. Two Resolution Applicants came forth before

the RP, namely: (i) I & E Advertising Private Limited; and (ii) a consortium representing

the home buyers. It appears that the developer had other projects as well, and the

consortium represented the homer buyers of all the projects.


9      In view of these developments, by an order dated 8 July 2021, this Court directed

that a meeting of the Committee of Creditors 11 be convened within a period of two

weeks so that a final decision could be taken on whether any of the Resolution Plans

are acceptable to it. The CoC consists only of representatives of the home buyers, no

financial institutions being involved. The Court has been apprised, by Mr Himanshu

Satija, counsel appearing on behalf of the RP, that by a vote of 96.93 per cent, the CoC

approved the Resolution Plan which was submitted by the consortium of home buyers.

On 21 August 2021, an application was filed by the RP for approval of the Resolution

Plan before the Adjudicating Authority and some objections have been received. The

Adjudicating Authority is yet to decide on this application for approval.




10 “RP”
11 “CoC”

                                             6
10    Mr Pawanshree Agarwal appears on behalf of the petitioners. Mr Himanshu

Satija appears for the RP. Mr Manoj Yadav appears for second to sixth respondents, a

group of home buyers. Mr Akshay Srivastava and Mr Ayush Sharma have intervened on

behalf of other home buyers.


11    Mr Pawanshree Agarwal, counsel appearing on behalf of the petitioners

submitted that during the course of the proceedings before this Court, settlements were

arrived at and hence the promoters of the Corporate Debtor, namely, the first

respondent should be held liable personally to honour the settlements, particularly

having regard to the order dated 1 April 2019, which was passed by the NCDRC in the

course of the execution proceedings. In this context, reliance has been placed on

paragraph 10(g) of the Resolution Plan which has been approved by the CoC, which

contains the following stipulation:

             “10(g). However, the erstwhile management, promoters (de jure or de
             facto), shareholders, managers, directors, officers, employees,
             workmen or other personnel who were in charge on or before CIRP
             commence date of THIPL shall continue to be liable for all the
             liabilities, claims, demand, obligations, penalties etc. arising out of
             any (i) proceedings, inquiries, investigations, orders, show causes,
             notices, suits, litigation etc. (including those arising out of any orders
             passed by the NCLT or any other court/department pursuant to the
             provisions of the Code or pursuant to any order passed/imposed by
             the SEBI), whether civil or criminal, pending before any authority,
             court, tribunal or any other forum prior to the acquisition of control by
             the Resolution Applicant over THIPL, or (ii) that may arise out of any
             proceedings, inquiries, investigations, orders, show cause, notices,
             suits, litigation etc. (including any orders that may be passed by the
             NCLT or any other court/department pursuant to the provisions of the
             Code), whether civil or criminal, that may be initiated or instituted
             post the approval of the Resolution Plan by the NCLT on account of
             any transactions entered into, or decisions or actions taken by, such
             existing management, promoters (de jure or de facto), shareholders,


                                                   7
              managers, directors, officers, employees, workmen or other
              personnel of THIPL, the new management of THIPL and/or the
              Resolution Applicant shall at no point of time be, directly or indirectly,
              held responsible or liable in relation thereto.”



12     The conspectus of facts before this Court reveals that the petitioners have

participated in the proceedings before the RP and later, the CoC. The Resolution Plan

which has been submitted by the consortium of home buyers stands approved by the

CoC and the proceedings are now pending before the Adjudicating Authority, awaiting

its approval under Section 31(1) of the under the IBC. If the petitioners have any

objections to the Resolution Plan, they are to submit them before the Adjudicating

Authority. We direct the NCLT to ensure that the application for approval is disposed of

expeditiously and preferably within a period of six weeks form the date of receipt of a

certified copy of this order.


13     Counsel for the petitioners urged that this Court should at the present stage

direct that the personal properties of the promoters be attached in view of the provisions

contained in the Resolution Plan which have been extracted earlier. The Resolution

Plan is still to be approved by the Adjudicating Authority under the provisions of Section

31(1) of the IBC. Hence, at this stage, when the Resolution Plan awaits approval, it

would not be appropriate for this Court to issue a direction of that nature. After the

Resolution Plan is approved under the provisions of Section 31(1), consequences

emanating from the statutory provision would ensue to the benefit of the home buyers.

Hence, we have already directed that the NCLT shall dispose of the approval

application filed on 21 August 2021, within a period of six weeks from the date of receipt

                                                    8
of a certified copy of this order.


14     Further, since the moratorium declared in respect of the first respondent

Corporate Debtor continues to operate under Section 14 of the IBC, no new

proceedings can be undertaken or pending ones continued against the Corporate

Debtor. Section 14(1) of the IBC reads as follows:

                “14. Moratorium.—(1) Subject to provisions of sub-sections (2) and
                (3), on the insolvency commencement date, the Adjudicating
                Authority shall by order declare moratorium for prohibiting all of the
                following, namely—

                (a) the institution of suits or continuation of pending suits or
                proceedings against the corporate debtor including execution of
                any judgment, decree or order in any court of law, tribunal, arbitration
                panel or other authority;

                (b) transferring, encumbering, alienating or disposing of by the
                corporate debtor any of its assets or any legal right or beneficial
                interest therein;

                (c) any action to foreclose, recover or enforce any security interest
                created by the corporate debtor in respect of its property including
                any action under the Securitisation and Reconstruction of Financial
                Assets and Enforcement of Security Interest Act, 2002 (54 of 2002);

                (d) the recovery of any property by an owner or lessor where such
                property is occupied by or in the possession of the corporate
                debtor.”

                                                                 (emphasis supplied)



15     At this juncture, we must however clarify the right of the petitioners to move

against the promoters of the first respondent Corporate Debtor, even though a

moratorium has been declared under Section 14 of the IBC. In the judgment in P.

Mohanraj v. Shah Bros. Ispat (P) Ltd.12, a three judge Bench of this Court held that
12 (2021) 6 SCC 258

                                                     9
proceedings under Section 138 and 141 of the Negotiable Instruments Act 1881 against

the Corporate Debtor would be covered by the moratorium provision under Section 14

of the IBC. However, it clarified that the moratorium was only in relation to the

Corporate    Debtor     (as    highlighted     above)      and     not    in   respect   of   the

directors/management of the Corporate Debtor, against whom proceedings could

continue. Speaking through Justice Rohinton F Nariman, the Court held:

             “102. Since the corporate debtor would be covered by the
             moratorium provision contained in Section 14 IBC, by which
             continuation of Sections 138/141 proceedings against the corporate
             debtor and initiation of Sections 138/141 proceedings against the
             said debtor during the corporate insolvency resolution process are
             interdicted, what is stated in paras 51 and 59 in Aneeta Hada [Aneeta
             Hada v. Godfather Travels & Tours (P) Ltd., (2012) 5 SCC 661 :
             (2012) 3 SCC (Civ) 350 : (2012) 3 SCC (Cri) 241] would then
             become applicable. The legal impediment contained in Section 14
             IBC would make it impossible for such proceeding to continue or be
             instituted against the corporate debtor. Thus, for the period of
             moratorium, since no Sections 138/141 proceeding can continue
             or be initiated against the corporate debtor because of a
             statutory bar, such proceedings can be initiated or continued
             against the persons mentioned in Sections 141(1) and (2) of the
             Negotiable Instruments Act. This being the case, it is clear that
             the moratorium provision contained in Section 14 IBC would
             apply only to the corporate debtor, the natural persons
             mentioned in Section 141 continuing to be statutorily liable
             under Chapter XVII of the Negotiable Instruments Act.”

                                                            (emphasis supplied)



We thus clarify that the petitioners would not be prevented by the moratorium under

Section 14 of the IBC from initiating proceedings against the promoters of the first

respondent Corporate Debtor in relation to honoring the settlements reached before this

Court. However, as indicated earlier, this Court cannot issue such a direction relying on


                                                10
a Resolution Plan which is still pending approval before an Adjudicating Authority.


16    In view of the above directions, SLP (C) No 12150 of 2019 and SLP (C) Diary No

45043 of 2019 shall stand disposed of as well as the civil appeal, being Civil Appeal

Nos 5231-5238 of 2019. Liberty is granted to the petitioners to take recourse to the

remedies which are available in law after the decision of the Adjudicating Authority on

the approval application under Section 31(1), and subject to the consequence

thereafter.


17    Pending applications, if any, stand disposed of.



                                       …….………….…………………...........................J.
                                       [Dr Dhananjaya Y Chandrachud]




                                       …….…………………………...............................J.
                                       [Vikram Nath]




                                       …….…………………………...............................J.
                                       [Hima Kohli]
New Delhi;
September 8, 2021.




                                           11
ITEM NO.17            Court 4 (Video Conferencing)          SECTION XIV

               S U P R E M E C O U R T O F      I N D I A
                       RECORD OF PROCEEDINGS

Petition(s) for Special Leave to Appeal (C) No.12150/2019

(Arising out of impugned final judgment and order dated 27-03-2019
in CM(M) No.494/2019 passed by the High Court of Delhi at New
Delhi)


ANJALI RATHI & ORS.                                     Petitioner(s)

                                  VERSUS

TODAY HOMES AND INFRASTRUCTURE PRIVATE                  Respondent(s)
LIMITED & ORS.

(With   appln.(s)   for   IA    No.189907/2019   -   APPLICATION  FOR
TRANSPOSITION, IA No.137917/2019 - APPROPRIATE ORDERS/DIRECTIONS,
IA No.9475/2020 – CLARIFICATION/DIRECTION, IA No.112708/2019 -
DELETING THE NAME OF PETITIONER/RESPONDENT, IA No.78445/2019 -
EXEMPTION   FROM   FILING   C/C    OF   THE  IMPUGNED   JUDGMENT,  IA
No.90924/2019 - PERMISSION TO FILE ADDITIONAL DOCUMENTS/ FACTS/
ANNEXURES, IA No.9466/2020 - PERMISSION TO FILE ADDITIONAL
DOCUMENTS/FACTS/ANNEXURES, IA No.78779/2019 - PERMISSION TO FILE
ADDITIONAL    DOCUMENTS/FACTS/ANNEXURES,     IA    No.192354/2019   -
PERMISSION   TO   FILE   ADDITIONAL    DOCUMENTS/FACTS/ANNEXURES,  IA
No.169275/2019 - PERMISSION TO FILE ADDITIONAL DOCUMENTS/FACTS/
ANNEXURES, IA No.137927/2019 - PERMISSION TO FILE ADDITIONAL
DOCUMENTS/FACTS/ANNEXURES and IA No.109715/2019 - VACATING STAY)

WITH C.A. Nos.5231-5238/2019 (XVII-A)
(With appln.(s) for IA No.81972/2019-EXEMPTION FROM FILING C/C OF
THE IMPUGNED JUDGMENT and IA No.81971/2019-CONDONATION OF DELAY IN
FILING APPEAL)
Diary No.45043/2019 (XVII)
(With appln.(s) for I.R. and IA No.192894/2019-EXEMPTION FROM
FILING C/C OF THE IMPUGNED JUDGMENT and IA No.192892/2019-
PERMISSION TO FILE SLP and IA No.192974/2019-PERMISSION TO FILE
ADDITIONAL DOCUMENTS/FACTS/ANNEXURES)


Date : 08-09-2021 These matters were called on for hearing today.



                                   12
CORAM :
                   HON'BLE DR. JUSTICE D.Y. CHANDRACHUD
                   HON'BLE MR. JUSTICE VIKRAM NATH
                   HON'BLE MS. JUSTICE HIMA KOHLI


For Petitioner(s)
                          Mr. Pawanshree Agrawal, AOR

For Respondent(s)         Mr. Himanshu Satija, Adv.
                          Mr. E. C. Agrawala, AOR

                          Mr. Manoj Yadav, Adv.
                          Mr. Sushil Kaushik, Adv.
                          Mr. Ranbir Singh Yadav, AOR

                          Mrs. Shally Bhasin, AOR

                          Mr. Ayush Sharma, AOR

                          Mr.   Aditya Parolia, Adv.
                          Mr.   Piyush Singh, Adv.
                          Mr.   Nithin Chandran, Adv.
                          Mr.   Akshay Srivastava, Adv.
                          Ms.   Aditi Sinha, Adv.
                          Mr.   Rajesh Kumar, Adv.
                          Mr.   Gaurav Goel, AOR


               UPON hearing the counsel the Court made the following
                                O R D E R

1 Permission to file the Special Leave Petition is granted. 2 The Special Leave Petitions and the Civil Appeals are disposed of in terms of the signed reportable judgment.

3 Pending applications, if any, stand disposed of.

            (CHETAN KUMAR)                     (SAROJ KUMARI GAUR)
             A.R.-cum-P.S.                         Court Master

(Signed reportable judgment is placed on the file) 13