Delhi District Court

Soma Networks Software vs Canon India Pvt. Ltd on 12 February, 2018

               IN THE COURT OF SHRI GIRISH KATHPALIA, 
                     DISTRICT & SESSIONS JUDGE
                SOUTH EAST : SAKET COURT, NEW DELHI.


ARBITRATION No. 420/2016 (21340/2016)

SOMA NETWORKS SOFTWARE 
ENGINEERING PVT. LTD.
HAVING ITS REGISTERED OFFICE AT
A­133, NEETI BAGH, NEW DELHI 110049                ....PETITIONER

                                          VERSUS

CANON INDIA PVT. LTD.
HAVING ITS REGISTERED OFFICE AT 
D­179, OKHLA INDUSTRIAL AREA 
PHASE­I, NEW DELHI 110020
                                                                            ...RESPONDENT

Date of filing  : 01.09.2016 First date before this court : 23.05.2017 Arguments concluded on : 01.02.2018 Date of Decision :  12.02.2018 Appearance:  Ms. Smita Kant, counsel for petitioner  Ms. Shweta Bharti, Shri J.K. Chaudhary  and Ms. Swet Shikha, counsel for respondent J U D G M E N T 

1.  By   way   of   this   petition,   brought   under   the   provisions   of Section 34 of the Arbitration & Conciliation Act 1996, petitioner has sought setting aside of the arbitral award dated 02.05.2016, passed by learned  Sole Arbitrator appointed at the Delhi International Arbitration Arbitration No. 420/16 (21340/16)  Page 1 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  Centre, whereby claim of the present respondent was partly allowed to the  tune  of  Rs.   21,44,726/­  with  future   interest   at  a  rate  of  18%  per annum against the present petitioner.   Reply to the petition was filed on behalf of respondent and I heard  learned    counsel for both sides, who took me through record.

2. Briefly stated, factual matrix, under which dispute between the parties originated is as follows.

2.1  By   way   of   Rental   Agreement   dated   20.08.2008,   parties entered into a fixed period agreement, whereunder two multi­functional colour printers with two trolleys, two stabilizers, two e­copy software and   one   WAM   (hereinafter   collectively   referred   to   as   "the   said printers")  were leased out on monthly rental of Rs. 37,856/­ including taxes by the present respondent to the present petitioner for a period of 36   months   with   effect   from   31.12.2008   to   31.12.2011.     The   rental agreement   stipulated   that   in   case   of   delayed   payments,   the   present petitioner would be liable to pay interest at a rate of 1.5% per month.

2.2  On the basis of the above rental agreement, the said printers were   installed   in   the   Gurgaon   office   of   the   present   petitioner   on 31.12.2008.     Simultaneously,   parties   also   entered   into   a   service agreement towards maintenance of the said printers.

Arbitration No. 420/16 (21340/16)  Page 2 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  2.3  In respect of printer no. 1, invoices till the month of October 2009 and in respect of printer no. 2, invoices till the month of November 2009 were cleared by the present petitioner.   When despite respondent's repeated requests and reminders, the present petitioner did not clear its outstanding liability, respondent was constrained to terminate the rental agreement by way of repossession of the said printers on 05.07.2010.

2.4  Towards outstanding liability, the present respondent issued notice dated 19.07.2010 through its counsel.   When petitioner chose to ignore   the   legal   notice,   respondent   invoked   arbitration   clause   of   the rental   agreement   and   issued   notice   dated   20.08.2010,   proposing   the name of a retired Additional District & Sessions Judge as sole arbitrator in terms with the arbitration clause.   But the present petitioner opted to ignore even that notice and also neither accepted nor rejected name of the proposed arbitrator, nor suggested any other name.

2.5   Under these circumstances, the present respondent filed a petition under Section 11 of the Arbitration & Conciliation Act, 1996 before   the   Hon'ble   Delhi   High   Court   which   was   allowed,   thereby appointing the  learned  sole arbitrator, whose award is presently under challenge.

3.  The present petitioner joined the arbitral proceedings, which after   going   through   completion   of   pleadings,   admission/denial     of Arbitration No. 420/16 (21340/16)  Page 3 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  documents, recording of evidence followed by marathon final arguments finally   culminated   into   the   impugned   award.       After   an   elaborate discussion   of   the   rival   factual   and   legal   matrix   setup   by   parties,   the learned    sole arbitrator allowed claim of the present respondent partly, holding the present respondent entitled to a sum of Rs. 21,44,726/­ from the present petitioner with interest at a rate of 18% per annum.  Hence, the present petition.

4.  Broadly stated, petitioner has assailed the impugned award on two grounds.   Firstly, it is contended on behalf of petitioner that there was no valid arbitration agreement between the parties.   Secondly, the present respondent took no steps to mitigate the loss in view of clause 6

(c) (ii) (ii) of the Rental Agreement and Section 73 of the Contract Act and the learned  sole arbitrator fell in error by ignoring this aspect while passing   the   impugned   award.       On   the   other   hand,   respondent   has supported the impugned award, contending that clause 13 of the Rental Agreement is a clear and lawful arbitration agreement and there was no violation of clause 6 (c) (ii) (ii) of the Rental Agreement or Section 73 of the Contract Act.  On these two aspects, learned  counsel for both sides took   me   through   record   and   the   judicial   precedents.     The   said   two aspects   of   challenge   to   the   impugned   award   are   being   examined separately as follows.

Arbitration No. 420/16 (21340/16)  Page 4 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  CLAUSE 13 of RENTAL AGREEMENT 5.1  Learned  counsel for petitioner argued that according to the legal  position,  unless  there  is an explicit stipulation in the concerned agreement or clause to the effect that decision of the arbitrator shall be final and binding, there cannot be an arbitration agreement/clause.     It was argued by learned counsel for petitioner that since clause 13 of the Rental   Agreement,   which   is   relied   upon   by   the   respondent   and   the learned  sole arbitrator, does not explicitly stipulate that decision of the arbitral   tribunal   would   be   final   and   binding,   it   cannot   be   treated   as arbitration clause.   On this aspect, learned  counsel for petitioner  placed reliance on the judgments of  Hon'ble Supreme Court of India  in the cases of  Jagdish Chander vs Ramesh Chander & Ors., 2007(2) RAJ 638 (SC);   Bihar State Mineral Development Coporation & Anr. vs Encon Builders (I) (P) Ltd., (2003) 7 SCC 418; and K.K. Modi vs K. N. Modi & Ors., (1998) 3 SCC 573.  

5.2  Per   contra,  learned    counsel   for   respondent   strongly contended that clause 13 of the Rental Agreement is complete in itself as a valid arbitration agreement.   It was argued by  learned    counsel for respondent that it is the intention of the parties to an agreement that has to be kept in mind while deciding as to whether the agreement/clause in Arbitration No. 420/16 (21340/16)  Page 5 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  question is a valid arbitration agreement/clause.   Learned    counsel for respondent placed reliance on the judgment of Hon'ble Supreme Court of India  in the case of  Rukmanibai Gupta vs Collector, Jabalpur & Ors., (1980) 4 SCC 556.

5.3 It   would   be   apposite   to   first   traverse   through   the   legal position related to the meaning and content of  "arbitration agreement".

5.4  Section 7 (1) of the Arbitration & Conciliation Act 1996 defines the term Arbitration Agreement thus:

"7.     Arbitration   Agreement   -   (1)   In   this   part,   "arbitration agreement" means an agreement by the parties to submit to arbitration all or certain disputes which have arisen or which may   arise   between   them   in   respect   of   a   defined   legal relationship, whether contractual or not."

As   per   further   sub­sections   of   Section   7   of   the   Act,   an   arbitration agreement may be in the form of an arbitration clause in a contract or in the  form  of  a  separate  agreement  but  the  same   has  to  be  in  writing, whether   by   way   of   a   document   signed   by   parties   or   exchange   of communications, claims and defence etc.   5.5  In   the   case   of  Bihar   State   Mineral   Development Coporation & Anr.  (supra), relied upon by  counsel for petitioner, the Hon'ble Supreme Court of India held that the essential elements of an arbitration   agreement   are   that   there   must   be   a   present   or   a   future Arbitration No. 420/16 (21340/16)  Page 6 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  difference in connection with some contemplated affair; that there must be clear intention of the parties to get settled such difference by a private tribunal;   that   the   parties   must   agree   in   writing   to   be   bound   by   the decision of such tribunal; and that the parties must be at ad idem.

5.6  In the case of K.K. Modi (supra), relied upon by counsel for petitioner, the  Hon'ble Supreme Court of India  held that amongst the attributes which must be present for an agreement to be considered as an arbitration agreement are that the agreement must contemplate that the decision of the tribunal will be binding on the parties to the agreement; that the jurisdiction of the tribunal to decide the rights of the parties must be derived either from the consent of the parties or from order of the court or from a statute, the terms of which make it clear that the process is   to   be   an   arbitration;   that   the   agreement   must   contemplate   that substantive rights of parties will be determined by the agreed tribunal; that the tribunal will determine the rights of the parties in an impartial and   judicial   manner   with   the   tribunal   owing   an   equal   obligation   of fairness towards both sides; that the agreement of the parties to refer their   dispute   to   the   decision   of   the   tribunal   must   be   intended   to   be enforceable in law; and that the agreement must contemplate that the tribunal will make a decision upon  dispute which is already formulated at   the   time   when   a   reference   is   made   to   the   tribunal.     The   Hon'ble Supreme   Court   of   India  further   observed   that   while   there   are   no conclusive   tests,   by   and   large   one   can   follow   a   set   of   guidelines   in Arbitration No. 420/16 (21340/16)  Page 7 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  deciding   whether   the   agreement   is   to   refer   an   issue   to   an   expert   or whether   the   parties   have   agreed   to   resolve   the   disputes   through arbitration.   It  was  held that  nomenclature used  by  the  parties  is  not conclusive and the court has to examine the true intent and purport of the agreement.

5.7  The judgment in the case of   Jagdish Chander  (supra) is relied   upon   by  learned    counsel   for   petitioner   only   on   the   limited observation   of   the  Hon'ble  Supreme   Court   of   India  that   one   of   the attributes of arbitration agreement is that the parties should have agreed that decision of the arbitral tribunal will be binding on them.

5.8  In the case of   Rukmanibai Gupta  (supra) relied upon by learned    counsel for respondent, the  Hon'ble Supreme Court of India while dealing with the provisions under the Arbitration Act 1940  held that an arbitration agreement is not required to be in any particular form and what is required to be ascertained is whether the parties have agreed that if disputes arise between them in respect of the subject matter of the contract,   such   disputes   shall   be   referred   to   arbitration,   then   such   an arrangement would spell out an arbitration agreement.

5.9  In   the   case   of    Karnataka   Power   Transmission Corporation Ltd. vs Deepak Cables (India) Ltd.,  (2014) 11 SCC 148, Arbitration No. 420/16 (21340/16)  Page 8 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  the  Hon'ble   Supreme   Court   of   India  recapitulated   various   judicial precedents on the issue under discussion and held thus :

"8. From the aforesaid provision, it is graphically clear that unless   an   arbitration   agreement   stipulates   that   the   parties agree to submit all or certain disputes which have arisen or which   may   arise   in   respect   of   defined   legal   relationship, whether contractual or not, there cannot be reference to an arbitrator.       To   elaborate,   it   conveys   that   there   has   to   be intention, expressing the consensual acceptance to refer the dispute   to  an  arbitrator.       In  the   absence  of  an  arbitration clause in an agreement, as defined in Sub­section 4 of Section 7, the dispute/disputes between the parties cannot be referred to the arbitral tribunal for adjudication of the disputes". 

In   the   said   case,   the   concerned   arbitration   clause   of   the   contract specifically stipulated about finality and bindingness of the decision of the Engineer upon the parties.  But the  Hon'ble Supreme Court of India while carrying out analysis of the concerned clause observed thus :

"24. .... There is also a stipulation that his decision in respect of every matter so referred to shall be final and binding upon the parties until the completion of works and is required to be given effect to by the contractor who shall proceed with the works with due diligence.   To understand the intention of the parties, this  part of the  clause is  important.    On a studied scrutiny of this postulate, it is graphically clear that it does not   provide   any   procedure   which   would   remotely   indicate that the Engineer concerned is required to act judicially as an adjudicator by following the principles of natural justice or to consider the submission of both the parties. ..."

5.10  In the case of  Jagdish Chander  (supra) also, the  Hon'ble Supreme Court of India recapitulated various judicial pronouncements on the issue under consideration and held thus :

Arbitration No. 420/16 (21340/16)  Page 9 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd. 
"8.   This   court   had   occasion   to   refer   to   the   attributes   or essential elements of an arbitration agreement in K.K. Modi vs K. N. Modi & Ors., (1998) 3 SCC 573: 1998 (2) R.A.J. 1, Bharat   Bhushan   Bansal   vs   U.P.   Small   Industries Corporation Ltd., 1999(2) SCC 166: 1999(1)R.A.J 378 and Bihar   State   Mineral   Development   Coporation   &   Anr.   vs Encon Builders (I) (P) Ltd.,  (2003) 7 SCC 418: 2003 (3) R.A.J. 1. In State of Orissa vs Damodar Das, 1996 (2) SCC 216,   this   Court   held   that   a   clause   in   a   contract   can   be construed as an 'arbitration agreement' only if an agreement to refer disputes or differences to arbitration is expressly or impliedly spelt out from the clause.   We may at this juncture set out the well settled principles in regard to what constitutes an arbitration agreement :
(i)  The intention of the parties to enter into an arbitration agreement shall have to be gathered from the terms of the agreement. If the terms of the agreement clearly indicate an intention on the part of the parties to the agreement to refer their   disputes   to   a   private   tribunal   for   adjudication   and   a willingness to be bound by the decision of such tribunal on such disputes, it is arbitration agreement. While there is no specific   form   of   an   arbitration   agreement,   the   words   used should   disclose   a   determination   and   obligation   to   go   to arbitration   and   not   merely   contemplate   the   possibility   of going for arbitration. Where there is merely a possibility of the   parties   agreeing   to   arbitration   in   future,   as   contrasted from an obligation to refer disputes to arbitration, there is no valid and binding arbitration agreement.
(ii) Even if the words 'arbitration' and 'arbitral tribunal (or arbitrator)'   are   not   used  with   reference   to   the   process   of settlement or with reference to the private tribunal which has to   adjudicate   upon   the   disputes,   in   a   clause   relating   to settlement of disputes,  it does not detract from the clause being an arbitration agreement if it has the attributes or elements  of an  arbitration  agreement.  They are  : (a) The agreement should be in writing. (b) The parties should have agreed to refer any disputes (present or future) between them to the decision of a private tribunal. (c) The private tribunal should be empowered to adjudicate upon the disputes in an impartial manner, giving due opportunity to the parties to put Arbitration No. 420/16 (21340/16)  Page 10 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd. 

forth their case before it. (d) The parties should have agreed that   the   decision   of   the   Private   Tribunal   in   respect   of   the disputes will be binding on them.

(iii) Where the clause provides that in the event of disputes arising between the parties, the disputes shall be referred to Arbitration, it is an arbitration agreement. Where there is a specific and direct expression of intent to have the disputes settled   by   arbitration,   it   is   not   necessary   to   set   out   the attributes   of   an   arbitration   agreement   to   make   it   an arbitration   agreement.  But   where   the   clause   relating   to settlement   of   disputes,   contains   words   which   specifically excludes any of the attributes of an arbitration agreement or contains anything that detracts from an arbitration agreement, it will not be an arbitration agreement. For example, where an agreement requires or permits an authority to decide a claim or dispute without hearing, or requires the authority to act in the interests of only one of the parties, or provides that the decision of the Authority will not be final and binding on the parties, or that if either party is not satisfied with the decision of the  Authority,  he may file a  civil  suit seeking  relief,  it cannot be termed as an arbitration agreement.

(iv) But mere use of the word 'arbitration' or 'arbitrator' in a clause will not make it an arbitration agreement, if it requires or contemplates a further or fresh consent of the parties for reference to arbitration. For example, use of words such as "parties   can,   if   they   so   desire,   refer   their   disputes   to arbitration" or "in the event of any dispute, the parties may also agree to refer the same to arbitration" or "if any disputes arise between the parties, they should consider settlement by arbitration"   in   a   clause   relating   to   settlement   of   disputes, indicate that the clause is not intended to be an arbitration agreement. Similarly, a clause which states that "if the parties so   decide,   the   disputes   shall   be   referred   to   arbitration"   or "any   disputes   between   parties,   if   they   so   agree,   shall   be referred to arbitration" is not an arbitration agreement. Such clauses merely indicate a desire or hope to have the disputes settled by arbitration, or a tentative arrangement to explore arbitration   as   a   mode   of  settlement   if   and   when   a   dispute arises. Such clauses require the parties to arrive at a further agreement to go to arbitration, as and when the disputes arise. Any   agreement   or   clause   in   an   agreement   requiring   or Arbitration No. 420/16 (21340/16)  Page 11 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd. 

contemplating   a   further   consent   or   consensus   before   a reference to arbitration, is not an arbitration agreement, but an agreement to enter into an arbitration agreement in future. (emphasis supplied) 5.11  In   the   case   of  Jagdish   Chander  (supra)   the   concerned clause   in   the   agreement   stipulated   that   if   during   continuance   of partnership any dispute arose, the same shall be mutually decided by partners or shall be referred for arbitration if the parties so determine. The  Hon'ble Supreme Court of India  took a view that the expression "determine"   used   in   the   concerned   clause   reflected   intention   of   the parties that they are required to reach a decision by application of mind as to whether the dispute be referred to arbitration or not.   The Hon'ble Supreme Court of India categorically held that if the clause had merely said that in the event of disputes arising between the parties, they shall be referred to arbitration, it would have been an arbitration agreement.  

5.12  In the case of   K.K. Modi  (supra) the concerned clause of the agreement was :

"3. ... implementation will be done in consultation with the financial institutions.     For all disputes, clarifications etc in respect of implementation of this agreement, the same shall be   referred   to   the   Chairman,   IFCI   or   his   nominees   whose decision will be final and binding on both the groups".

Despite the stipulation of finality and bindingness of the decision of IFCI Chairman and despite the use of words "arbitration" in communication between the parties, the Hon'ble Supreme Court of India held it not to Arbitration No. 420/16 (21340/16)  Page 12 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  be an arbitration agreement because intention of parties was not to have any   judicial   determination   on   the   basis   of   evidence   led   before   the Chairman IFCI, nor was the Chairman IFCI required to base his decision only   on   the   material   placed   before   him   by   the   parties   and   their submission and he was free to make his own inquiries and apply his own expertise with or without help of other experts.  

5.13 The above discussed judicial precedents would reflect that the   cases   where   emphasis   was   laid   on   the   stipulation   of   finality   and bindingness in the agreement are those in which the concerned clause did not  specifically  stipulate   the  procedure  of  dispue   resolution   to   be arbitration under the applicable arbitration law.  The ratio laid down in all   those   judicial   pronouncements   clearly   is   that   mere   stipulation   of finality and bindingness, on which so much of emphasis was laid by learned  counsel for petitioner, is not the decisive factor while arriving at a decision as to whether the agreement or the clause under consideration is an arbitration agreement.     It is the concerned clause or agreement which has to be read in its entirety in order to deduce the intention of the parties as to whether the intention was to get the disputes referred to arbitration.

5.14  Falling   back   to   the   present   case,  in   order   to   arrive   at intention of the parties in the process of examining the challenge to the validity of arbitration clause, it would be necessary at the outset to refer Arbitration No. 420/16 (21340/16)  Page 13 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  to the said clause, which is as under.

"13.  All disputes or differences arising between the parties in respect   of   these   terms   and   conditions   shall   be   settled   by arbitration   under   the   provisions   of   the   Arbitration   and Conciliation Act 1996.     The venue of arbitration shall be Delhi".
     

5.15  It   would   also   be   significant   to   examine   clause   14   of   the Rental Agreement, which is as follows.

"14.   This agreement shall, subject to the dispute resolution procedure herein above set out in clause 13, be subject to the exclusive   jurisdiction   of   courts   of   Delhi   and   shall   be governed by and construed in accordance with the laws of India".

5.16  From above two clauses, an irresistible conclusion is that the   parties   had   expressed   clear   and   unambiguous     intention   that   all disputes arising between them in respect of the Rental Agreement shall be   settled   by   arbitration;   that   the   said   arbitration   shall   be   under   the Arbitration and Conciliation Act 1996; that the seat of arbitration shall be in Delhi; and that the jurisdiction for adjudication of disputes shall be of the Delhi courts and the said resort to Delhi courts shall be subject to the parties adopting the dispute resolution procedure stipulated in clause 13 of the Rental Agreement.

5.17  As held in the case of Jagdish Chander (supra) non­use of Arbitration No. 420/16 (21340/16)  Page 14 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  words   "arbitration"   and   "arbitral   tribunal"   or   "arbitrator"   would   not detract a clause from being interpreted as an arbitration agreement if the attributes   or   elements   of   arbitration   agreement   are   established.       As further quoted above from the said judgment, the stipulation of finality and bindingness of the decision of the arbitrator has to be looked for in a case where the concerned clause does not use the words "arbitration" or "arbitral tribunal" since if those expressions are not used, the court has to look for other attributes of arbitration agreement.  Therefore, merely on account of absence of an explicit stipulation in clause 13 of the Rental Agreement regarding finality and bindingness, the said clause cannot be held   to   be   not   an   arbitration   clause   since   all   the   attributes   of   an arbitration agreement are clearly established.

5.18  Clause 13 of the Rental Agreement stipulated the process of "arbitration" not vaguely or loosely but specifically as an exercise under the   Arbitration   and   Conciliation   Act   of   1996,   Section   35   whereof explicitly lays down the finality and bindingness of an arbitral award on not just the warring parties but even their successors in interest.   It is the content and not form of the clause which has to be kept in mind.

5.19 In   an   exercise   to   deduce   intention   of   the   parties,   it   also would be significant that as mentioned above, in clause 13 of the Rental Agreement, parties even arrived at agreement qua the seat of arbitration which also shows that they intended to refer their disputes to arbitration.

Arbitration No. 420/16 (21340/16)  Page 15 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  5.20  Even   clause   14   of   the   Rental   Agreement   conveys   clear intention of the parties that disputes shall be taken to courts of Delhi only subject to the dispute resolution procedure set out in clause 13.  In other   words,   parties   were   more   than   sufficiently   conscious   that   for resolution of their disputes, they have to fall back upon clause 13 only, which also is a significant indicator of their intention to refer disputes to arbitration.

5.21 Unlike   in   the   case   of  Karnataka   Power   Transmission (supra)   in   the   present   case,   clause   13   of   the   Rental   Agreement specifically stipulates that the dispute resolution procedure has to be the procedure laid down under the Arbitration and Conciliation Act 1996.  It is also not a case where the private tribunal contemplated by the parties for dispute resolution is free to decide as per his own expertise etc.   The tribunal contemplated has no option, but to follow the procedure laid down under the Arbitration & Conciliation Act, 1996.

5.22 Further, it is not a case of appointment of arbitrator by one of the parties unilaterally.  The learned  sole arbitrator was appointed by the Hon'ble Delhi High Court in the proceedings under Section 11 of Arbitration and Conciliation Act 1996, applying clause 13 of the Rental Agreement.

Arbitration No. 420/16 (21340/16)  Page 16 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  5.23  There   is   yet   another   aspect.       In   all   the   judicial pronouncements,   cited   by   both   sides,   the   interpretation   given   to   the concerned   clause  was  such   that  the  clause   in  itself   was   not  rendered redundant.   But in the present case, going by the interpretation given to clause 13 of the Rental Agreement by learned  counsel for petitioner, the said   clause   would   be   rendered   totally   redundant   and   would   leave unanswered quandary as to why the parties inserted a redundant clause in their agreement.   In the proceedings under Section 34 of the Arbitration and Conciliation Act, the court cannot give such an interpretation to a clause of the contract which would make the clause redundant.

5.24  In   view   of   above   discussion,   I   am   unable   to   uphold   the petitioner's objection that clause 13 of the Rental Agreement was not an Arbitration Clause between the parties.

CLAUSE 6 (c) (ii) (ii) OF RENTAL AGREEMENT

6.    Learned    counsel for petitioner   argued that in terms of Section 73 of the Contract Act, the present respondent was duty bound to mitigate   losses   by   selling   away   the   said   printers   after   repossession, which was not done.   It was further argued that even clause 6 (c) (ii) (ii) of the Rental Agreement specifically stipulated that money from selling the said printers had to be deducted while satisfying claims of the present Arbitration No. 420/16 (21340/16)  Page 17 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  respondent but the same was not done.     It was argued that instead of selling away the said printers after repossession, the present respondent deducted a sum of Rs. 10,000/­ per printer as notional value of the same, which   was   upheld   by   the  learned    sole   arbitrator   and   thereby   the arbitrator ventured into interpretation and thereby rewriting of clause 6

(c) (ii) (ii) of the agreement and that crept in illegality into the award.   It was argued that the learned  sole arbitrator gave no reasons justifying a sum   of  Rs.  10,000/­   per  printer   as  a  fair   notional  price  of  the  same. Learned    counsel   for   petitioner    placed   reliance   on   the   judgment   of Hon'ble Supreme Court of India in the case of  Sharma & Associates Contractors Pvt. Ltd. vs Progressive Constructions Ltd., (2017) 5 SCC

743.   

7.  Per contra,  learned    counsel for respondent argued that the learned  sole arbitrator has given detailed reasons for accepting a sum of Rs.   10,000/­   per   printer   as   notional   value   of   the   said   printers   after repossession of the same.   It was argued that computers and peripherals, by their very nature become obsolete very soon and their market value drastically falls, so the said printers after repossession could have been sold only as a scrap and that value of the said printers would have been much lesser.   It was argued that the learned  sole arbitrator faced with two views namely actual sale price and approximate sale price accepted the latter view keeping in mind the nature of goods, so there was no illegality in the view taken by the learned  sole arbitrator and opting for Arbitration No. 420/16 (21340/16)  Page 18 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  one   view   instead   of   the   other   does   not   amount   to   interpreting   or rewriting the contract.    Learned counsel for respondent placed reliance on the judgments of Hon'ble Supreme Court of India in the cases of M. Lachia Setty & sons Ltd. vs Coffee Board, Bangalore,  (1980) 4 SCC 636;  Richmond   Mercantile   Ltd.   FZC   vs   Vinergy   International   Pvt. Ltd., MANU/MH/1079/2016; State Trading Corporation of India Ltd. vs   M/s   Toepfer   International   Asia   Pte   Ltd.,  FAO   (OS)   242/2014 decided on 02nd July 2014; Rashtriya Ispat Nigam Ltd. vs M/s Dewan Chand Ram Saran, Civil Appeal No. 3905/12 decided on 25.04.2012 by the bench of Hon'ble Mr. Justice H.L. Gokhale;  Fiza Developers and Inter­Trade Pvt. Ltd. vs AMCI (I) Pvt. Ltd. & anr., (2009) 17 SCC 796; and Maharashtra State Electricity Distribution Company Ltd. vs Datar Switchgear Ltd. & Ors., MANU/SC/0017/2018.

8.   To start with, it would be apposite to refer to clause 6 (c) (ii)

(ii) of the Rental Agreement which is at the fulcrum of this discussion and the same is worded as follows.

"6.   Notwithstanding   anything   contrary   contained   in   this agreement,   this   agreement   may   be   terminated   by   CIPL forthwith (without being liable in any manner to the hirer for the same) during the fixed period of hire (as stated in the schedule  I)  and  the   Equipment  will  be  repossessed  by  the CIPL if :
(a) .....
(b) .....
(c) ....
(ii) When CIPL brings this agreement to an end for one of the Arbitration No. 420/16 (21340/16)  Page 19 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd. 
reasons given above, the hirer shall pay to CIPL :
(a)  all the rental charges and maintenance charges hirer owe to CIPL on the date of end of the agreement;
(b) any costs in relation to the Equipment and services and collecting the rental or maintenance charges;
(c)   compensation   of   CIPL's   loss   of   profit   computed   as mentioned below.

This will be the sum of the fixed monthly rental charges hirer would have to pay during the remainder of the period of hire less the total of the following :

(i) ....
(ii) the money from selling the Equipment after all deduction have been taken".

9.  The above mentioned clause, according to petitioner  could not be stretched to cover notional price of the said printers, since the concerned   clause  specifically  stipulated  that  the  equipment   had  to  be sold   and   the  cost   recovered   has   to  be   deducted   while   computing  the compensation,   but   since   the  learned    sole   arbitrator   approved   of   the notional price of the said computers, the award is bad in law.

10. This argument of petitioner has been examined in detail by the  learned    sole   arbitrator   in   the   impugned   award.     The  learned arbitrator took a view that the witness of the present respondent is a marketing personnel and it is nobody's case that the said printers were not owned by the respondent and it is also nobody's case that after the contract   period   of   36   months,   the   said   printers   would   have   been purchased by the respondent and that being so, the present petitioner has no concern at all as to whether the printers were actually sold or not. Further, the  learned  sole arbitrator also observed that even the present Arbitration No. 420/16 (21340/16)  Page 20 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  petitioner did not lead any evidence to challenge the notional value of the said printers. After  discussing the material on record, the  learned sole arbitrator delivered a finding of fact that the amount of Rs. 10,000/­ per   printer   is   not   imaginary   value   but   the   same   is   based   on   factual criteria.

11.  In the case of Richmond Mercantile Ltd. FZC (supra), the Hon'ble   Bombay   High   Court  discussed   the   judgment   of  Hon'ble Supreme Court of India  in the case of  Murlidhar Chiranji Lal vs Harishchandra   Dwarkadass,  MANU/SC/0113/1961   (referred   to before the  learned    arbitrator on behalf of present petitioner)  and observed thus :

"60.  Insofar as the judgment of the Supreme Court in case of Murlidhar Chiranji Lal (supra) relied upon by the learned senior counsel for respondent is concerned, it is held by the Supreme Court that the petitioner is debarred from claiming any part of damages which is due to his neglect to take such steps and it is his duty to take all reasonable steps to mitigate the loss consequent on the breach.   In the facts of this case, the  petitioner  had taken  various   steps   to  mitigate  the  loss. The petitioner had examined two witnesses whose evidence remained uncontroverted.   The arbitral tribunal has rendered a finding of fact that even in respect of those two shipments, there was a loss suffered by the petitioner inspite of the steps taken   by   the   petitioner   to   mitigate   the   loss.     The   said judgment of the Supreme Court thus would not assist the case of the respondent".

In the present  case also, owing to the nature of goods involved, i.e., printers, had the same been actually sold in the market, the same would Arbitration No. 420/16 (21340/16)  Page 21 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  not  have fetched even Rs. 10,000/­  per  printer, which is the notional value accepted by the learned  sole arbitrator.  It cannot be disputed that the pace with which technology is growing in this country, all electronic items become obsolete in a matter of few months and thereafter can be sold only as scrap.  In such a scenario, instead of selling away the said computers in market to fetch much lower price, if the present respondent opted to take notional value at a rate of Rs. 10,000/­ per printer, which was rather to the benefit of the present petitioner, it cannot be found fault with and consequently, view taken by the learned  arbitrator also cannot be held to be not sustainable.   

12. The concerned clause 6 (c)(ii)(ii) of the Rental Agreement uses   the   expression   "money  from  selling   the   equipment"   and   not   an expression   "money  after  selling   the   equipment"   or   an   expression "money from selling the equipment in market".   As mentioned above, it is nobody's case that upon expiry of contract period, the said printers would have automatically become property of the petitioner by way of hire­purchase or even by way of subsequent  sale.   As also mentioned above, the present petitioner did not lead an iota of evidence to establish that had the said printers been sold in open market or to petitioner itself, the   same   would   have   fetched   more   than   Rs.   10,000/­   per   printer. Admittedly,   the   said   printers   were   used   by   the   present   petitioner   for commercial purposes and large number of printouts had already been taken by the time the said printers were repossessed.   In the backdrop of Arbitration No. 420/16 (21340/16)  Page 22 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  such   circumstances,   the   concerned   clause   was   amenable   to   multiple interpretations   and the view taken by the  learned  sole arbitrator being one  of  those,  upholding the  notional price  of   the said  printers  was  a plausible view   and it cannot be said that the  learned    sole arbitrator ventured beyond his jurisdiction.  

13. In   the   case   of  Rashtriya   Ispat   Nigam   Ltd.  (supra)   the Hon'ble Supreme Court of India held thus :

"29.  In any case, assuming that clause 9.3 was capable of two interpretations, the view taken by the arbitrator   was clearly a possible if not a plausible one.   It is not possible to say that the arbitrator had travelled outside his jurisdiction, or   that   the   view   taken   by   him   was   against   the   terms   of contract.   That being the position, the High Court had no reason to interfere with the award and substitute its view in place of the interpretation accepted by the arbitrator.    The legal   position   in   this   behalf   has   been   summarized   in paragraph 18 of the judgment of this court in SAIL vs Gupta Brother Steel Tubes Ltd. (supra) and which has been referred to above.     Similar view has been taken later on Sumitomo Heavy Industries Ltd. vs ONGC Ltd. reported in [2010 (11) SCC 296] to which one of us (Gokhale J.) was a party.   The observations in paragraph 43 thereof are instructive in this behalf.   This paragraph 43 reads as follows :
43.  The umpire has considered the fact situation and   placed   a   construction   on   the   clauses   of   the agreement which according to him was the correct one.     One may at the highest say that one would have preferred another construction of Clause 17.3 but   that   cannot   make   the   award   in   any   way perverse.   Nor can one substitute one's own view in such a situation, in place of the one taken by the umpire, which would amount to sitting in appeal.

As  held by this  Court in Kwality Mfg. Corpn. v.

Arbitration No. 420/16 (21340/16)  Page 23 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd. 

Central   Warehousing   Corpn*.       The   Court   while considering challenge to arbitral award does not sit in   appeal   over   the   findings   and   decision   of   the arbitrator,   which   is   what   the   High   Court   has practically   done   in   this   matter.       The   umpire   is legitimately entitled to take the view which he holds to be the correct one after considering the material before him and after interpreting the provisions of the agreement.     If he does so the decision of the umpire   has   to   be   accepted   as   final   and   binding.

*[2009 (5) SCC 142] (emphasis supplied)

14. Besides,   in   the   case   of  National   Highways   Authority   of India   vs   Oriental   Structural   Engineers   Pvt.   Ltd., MANU/DE/0080/2015,   the   Hon'ble   Delhi   High   Court   referred   to   the judgment   of  Hon'ble   Supreme   Court   of   India  in   the   case   of  Steel Authority of India Ltd. vs Gupta Brother Steel Tubes Ltd., (2009) 10 SCC 63 in which it was held that an error by the arbitrator related   to interpretation of contract is an error within his jurisdiction and is not an error on the face of the award and is not amenable to corrections by the courts.       It   was   further   held   that   the   legal   position   is   no   longer  res integra that the arbitrator having been made final arbiter of resolution of disputes between the parties, the award is not open to challenge on the ground that arbitrator reached at a wrong conclusion. Traversing through various judicial pronouncements, the Hon'ble Delhi High Court held that if   we   were   to   start   analyzing   the   contract   between   the   parties   and interpreting the terms and conditions thereof and which will necessarily have to be in the light of the contemporaneous conduct of the parties, it Arbitration No. 420/16 (21340/16)  Page 24 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  will be nothing else than sitting in appeal over the arbitral award and that is not permissible.  

15. The scope of judicial review of an arbitral award is akin to review under Article 226 of the Constitution of India of the decision of bodies, where it is a settled principle of law that judicial review is of the decision making process and not of the decision itself on merits and the same cannot be converted into an appeal.   Even Section 34 (2) (a) of the Act of 1996 amply clarifies the grounds of challenge on the lines of violation   of   principles   of   natural   justice   in   making   of   the   award   or invalidity   of   the   arbitral   agreement   and   non­arbitrability   of   disputes arbitrated and composition of the arbitral tribunal or arbitral procedure being not in accordance with the agreement between the parties.   None of   the   legislated   grounds   permits   to   challenge   an   arbitral   award   on merits.  

16. In the case of   Delhi Development Authority vs Bhardwaj Brothers,  MANU/DE/1753/2014, a division bench of the Hon'ble Delhi High Court observed thus :

"It cannot also be lost sight of that non­conferring of finality on the arbitral awards not only affects the speed and expense of  arbitration  but  also  has  a  more  subtle  consequences  of, extensive judicial review changing the nature of the arbitral process to an even greater extent.     If arbitration becomes simply another lever of decision making, subject to judicial review on merits, arbitrators may begin to decide cases and write   opinions   in   such   a   way   as   to   insulate   their   awards Arbitration No. 420/16 (21340/16)  Page 25 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd. 
against  judicial  reversal  producing  opinions  that  parrot  the appropriate   statutory   standards   in   conclusory   terms,   but suffer from a lack of reasoned analysis.  Such a shift from the arbitral   model   in   which   decision   makers   are   free   to   focus solely on the case before them rather than on the case as it might   appear   to   an   appellate   court,   to   the   administrative model,   in   which   decision   makers   are   often   concerned primarily with building a record for review, in my opinion would   substantially   undercut   the   ability   of   arbitrators   to successfully resolve disputes.   The courts therefore have no business weighing the merits  of the grievance, considering whether there is equity in a particular claim or determining whether there is particular language in the written instrument which will support the claim.  The agreement is to submit all grievances to arbitration, not merely those which the court may deem meritorious.       The courts if start undertaking to determine the merits of the grievance, would be usurping the function which under the Arbitration Act, 1996 is entrusted to the arbitration tribunal.   This plenary review by the courts of the merits would make meaningless the provisions that the arbitral award is final, for in reality it would almost never be final".

17. It   would   be   significant   to   note   that   in   the   case   of Maharashtra State Electricity Distribution Company Ltd. (supra) also, the Hon'ble Supreme Court of India dealt with the issue of mitigation of damages as  a separate chapter of the judgment and observed thus :

"60.  Mr. Rafique Dada also countered the argument of the appellant on mitigation of damages with the submission that this aspect was specifically considered and contention of the appellant in this behalf was rejected not only by the arbitral tribunal but by the High Court as well.     He referred to the relevant portion of the discussion in the award as well as the judgments.   
We find that the arbitral tribunal has dealt with this aspect and held that the contract objects were custom built in Arbitration No. 420/16 (21340/16)  Page 26 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd. 
the following manner :
55.  Respondents submitted that the claimants did not make any effort to mitigate the loss suffered.

The submission is without any merit for more than one   reason.     In   the   first   instance   the   contract objects manufactured in pursuance of the orders of the   respondents   were   custom   built,   i.e.   to   the specifications  laid down by the respondents and these contract objects cannot be disposed in open market.   Datar deposed with reference to Ex. C16 that efforts were made to sell the contract objects stranded in the factory to other electricity boards but   those   efforts   did   not   succeed.       It   was contended by the respondents  that   the claimant should   have   dismantle   the   stranded   contract objects   and   sold   the   components   thereof.   The submission   is   only   required   to   be   slated   to   be rejected.     Once   a   electronic   instrument   is dismantled, then the value almost becomes nil.   In any   event,   the   claimants   have   established   that efforts were made to mitigate the loss.

 

61.  The  learned  Single   Judge   as   well   as   the   Division Bench   of   the  High   Court  has   given   its   imprimatur   to   the aforesaid findings.   It, therefore,  becomes apparent that the objects in question were manufactured by respondent no. 2 to suit the specific needs of the appellant and they could not be used otherwise.   Therefore, there was no possibility on the part of respondent no. 2 to make an endeavour to dispose of the same in order to mitigate the losses".

18.  The   judgment   in   the   case   of  Sharma   &   Associates Contractors Pvt. Ltd. (supra) was referred to by the learned  counsel for petitioner    to buttress her argument that in contractual disputes, parties have to be strictly governed by the terms of contract and in such cases, Arbitration No. 420/16 (21340/16)  Page 27 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  equity has no role to play.  That being so, according to learned  counsel for petitioner, the respondent should have strictly adhered to the above mentioned clause and should have adjusted the actual sale price of the said printers instead of resorting to notional price and the learned  sole arbitrator, by allowing the notional price to be deducted fell in error of law, therefore, the impugned award is liable to be set aside.

19.   But   the   judgment   in   the   case   of  Sharma   &   Associates Contractors Pvt. Ltd. (supra) came up in totally distinct factual and legal situation with an altogether different context.     In the said case, tender floated by X was awarded to Y with permission for sub­contract; Y sub­ contracted the work to the respondent, who further sub­contracted the work   to   the   appellant;   payment   dispute   between   appellant   and respondent was referred to the arbitrator, who passed award in favour of appellant; Hon'ble Single Judge of the  High Court  affirmed the award but Hon'ble Division Bench set aside the same and hence the issue came up before the Hon'ble Supreme Court of India.  The  Hon'ble Supreme Court of India framed the issue as to whether the contract between the respondent and Y could govern the relationship between the appellant and the respondent.  The Hon'ble Supreme Court of India answered the issue in negative, holding that since appellant in its contract with the respondent was satisfied with the escalation clause, without insisting for ensuring that enhancement of rates by the principal employer X in favour of Y would ensure flowing of the same benefit to the appellant as well, Arbitration No. 420/16 (21340/16)  Page 28 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  whereas   the   respondent   had   ensured   the   same   while   entering   into contract with Y, the contract between the respondent and Y could not be extended to the appellant, though the respondent thereby deprived the appellant that benefit.     It is in this context that the  Hon'ble Supreme Court of India  held that equity has no role to play where parties are governed by a contract and the dispute is a contractual dispute.

20.  There is no allegation in the present case that the  learned sole arbitrator did not adopt a judicial approach or acted in violation of jus naturale.  It is also nobody's case that the learned  sole arbitrator has not  acted bonafide or has not dealt with the subject in a fair, reasonable and objective manner or that the decision of the learned  sole arbitrator was   actuated   by   any   extraneous   consideration.       No   perversity   or irrationality in the award has been made out nor it is contended to be a case of non­application of mind by the learned  sole arbitrator.

21.  In   view   of   above   discussion,   I   am   unable   to   uphold   the petitioner's objection that the impugned arbitral award is vitiated on the grounds of abrogation of clause 6 (c) (ii) (ii) of the Rental Agreement and/or Section 73 of the Contract Act.

CONCLUSION

22.  As   mentioned   above,   the   impugned   arbitral   award   was Arbitration No. 420/16 (21340/16)  Page 29 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.  challenged only on two grounds, which have been discussed and rejected above.

23.  I find no merit in the objections raised against the impugned arbitral award.  Consequently, the petition is dismissed.   A copy of this judgment along with original record of  learned    arbitrator be sent back and petition file be consigned to records. 

Announced in the open court on                                                                  this 12th day of February, 2018      (GIRISH KATHPALIA) GIRISH                                                    District & Sessions Judge KATHPALIA                                                        South East, Saket Courts                                                       New Delhi 12.02.2018 (a) Digitally signed by GIRISH KATHPALIA Date: 2018.02.13 11:54:37 +0530 Arbitration No. 420/16 (21340/16)  Page 30 of 30 pages Soma Networks Software Engg Pvt. Ltd. vs Canon India Pvt. Ltd.