State of Himachal Pradesh - Section

Section 31 in Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011

(31)"scheduled energy" means the quantum of energy scheduled by the State Load Despatch Centre to be injected into the grid by a generating station over a day;