Section 20(1)(vii) in The Bangalore Metro Railway (General) Rules, 2011
(vii)in case of complete failure of control from Operations Control Centre, the entire control may be transferred to a backup control centre at an alternate location, which may be at separate locations for traffic control and control of traction power;