State of Tamilnadu - Subsection

Section 9(ii) in The Central Electricity Regulatory Commission (Open Access in Inter-State Transmission) Regulations, 2004

(ii)The application shall contain the details, such as capacity needed, point(s) of injection, point(s) of drawal, duration of availing open access, peak load, average load and such other additional information that may be specified by the nodal agency: