(VIII)On the basis of deviation from injection/generation/drawal schedule vis-a-vis the actual generation and drawal, the intrastate UI pertaining to generating stations located within the state a worked out at S.No. (III), will be subtracted from the notional UI arrived at (VII i will be the aggregate Intrastate UI.