State of Rajasthan - Act
Rajasthan Electricity Regulatory Commission (Intra-State ABT) Regulations, 2006
RAJASTHAN
India
India
Rajasthan Electricity Regulatory Commission (Intra-State ABT) Regulations, 2006
Rule RAJASTHAN-ELECTRICITY-REGULATORY-COMMISSION-INTRA-STATE-ABT-REGULATIONS-2006 of 2006
- Published on 24 August 2006
- Commenced on 24 August 2006
- [This is the version of this document from 24 August 2006.]
- [Note: The original publication document is not available and this content could not be verified.]
1. Short title applicability and commencement.
2. Definitions.
3. Applicability of ABT.
- Intra-state ABT is applicable to the users, required to give daily schedules to the State Load Despatch Centre (SLDC), unless excluded from the applicability of ABT under these Regulations and fulfilling the following specific conditions during the period of its operation:Provided, the ABT applicability will remain suspended for the period of Grid disturbance, islanded mode of grid operation conveyed by SLDC as per grid Code provisions.4. Unscheduled Interchange (UI) rates.
- UI rates under intrastate ABT shall be the rates as specified by CERC for northern region for each 15 minutes block linked to frequency adjusted to account for inter state transmission losses as here under:UIS = UIR/(1 -L)Where:UIS is Intra-state ABT rate for a frequency stepUIR is UI rate applicable for Northern Region for that frequency stepL is Inter-state transmission losses of northern region in per unit5. Determination of schedule/drawal and intra-state UI charges.
- (1) Scheduling procedure. -All suppliers and all users (governed by inter state/intra state ABT) shall comply with the scheduling and dispatch requirements specified in the state grid code. The process of communicating the available capacity and load schedule for the day, shall be completed at least 2 Hrs. before, the commencement of the next day schedule by the SLDC.The SLDC will evolve a practicable procedure in line with the "Scheduling and Dispatch procedure" prescribed in chapter-9 of Grid Code part-II, - "Load Despatch & System Operation Code", for reporting the availability and the schedule will be such that all the scheduling activities are completed by 2300 Hrs. including the notifying spare capacity available in the State to effect its optimum use.6. Responsibility and requirements.
| S.No | Particulars | SLDC's energy account for | NRLD Cenergy account | Remark | ||||
| AVVNL | JVVNL | Jd. VVNL | trader/ DL | General Stn. | ||||
| A. | Alloc. Non ABT %Alloc. first chargeAlloc. ABT %Alloc. first chargeScheduled drawal/ generation (MU)1. drawal of licensee2. Gen. Non ABT3. Gen. ABT4. Net drawal from NR | 35%036%01800-175-900725 | 35%036%01800-175-900725 | 28%028%01400-140-700560 | 2%0040100-10-4050 | -500-2540 | 2060 | Alloc./Share shownin Column 3 to 6Alloc./Share shown in Column 3 to 6 |
| B. | Actual drawal/ generation (MU)1. actual drawal of licensee2. act. Gen. Non ABT3. act. Gen. ABT4. Net drawal from NR. | 1900-158-986756.1 | 1800-158-986656.1 | 1400-126-767506.8 | 80-9-4031 | -450-2780 | 1950 | Alloc./share shown inColumn 3 to 6Alloc./share shown in Column 3 to 6 |
| C. | Deviation from schedule = actual(-) schedule = (B)-(A) (MU)1. licensees2. Non ABT gen.3. ABT gen.4. Net UI licensees | 10017.5-86.431.1 | 017.5-86.4-68.9 | 014-67.2-53.2 | -2010-19 | 50-240 | -110 | |
| D. | Intra state UI calculations (tillNRLDC account is received) (MU)1. a. overdrawalb. under drawalc. overdrawal adj.d. underdrawal adj.2. inter discom exch.3. intra state UI D2-c3 | 31.100031.1117.50 | 0-68.90-53.71-15.1971.21 | 0-53.20-41.47-11.7355.47 | 0-190-14.81-4.19-4.19 | 00000240 | 0-110-1100.000 | |
| E. | Inter state UI on receipt ofNRLDC's account(MU)1. Total UI2. UI specific to lie.3. Adjustment for prev block4. adj. For NRLDC UI5. inter state UI E(2)+E(4) Billing | 808 | -2-64.46-66.46 | 4-49.77-45.77 prev. block | -17.77-17.77 | -12110-1-132 | To be adjusted only if its sign is same as thatof c(4). Otherwise carry forward to next block | |
| F. | Inter state ABT rate (Rs./Unit)1 for intra state UI (Rs. inmillion)2 for inter state UI (Rs. inmillion)Total (1+2) | 269.0817.60286.68 | 2.20163.08-146.2016.88 | 2.15127.04-100.6926.34 | intra state (Rs./Unit)-9.59-39.10-48.69 | ABT rate-549.60-549.60 | 2.29268.35268.35 | sum Column 3 to 80-0.05-0.05 |
| Particulars | Open Access Supplier not governed BY ABT | Open Access Supplier governed BY ABT | |||||||
| case-1 | case-2 | case-3 | case-4 | case-5 | case-6 | case-7 | case-8 | ||
| 1 | Open Access injection/schedule | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 |
| 2 | HT supply contract demand ('C') | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 |
| 3 | Stand by suppy contract demand ('S') | 9 | 9 | 9 | 9 | 9 | 9 | 9 | 10 |
| 4 | Actual dawal CD') | 8 | 15 | 20 | 27 | 8 | 15 | 20 | 27 |
| 5 | (a) Deviation from schedule | -2 | 5 | 10 | 17 | ||||
| (b) permissible deviation -5% to +5% at UI | -0.5 | 0.5 | 0.5 | 0.5 | |||||
| 6 | Open access entitlement ('E') | 10 | 10 | 10 | 10 | 9.5 | 10.5 | 10.5 | 10.5 |
| 7 | Adjustment for | ||||||||
| (a) Open access | 8 | 10 | 10 | 10 | 8 | 10.5 | 10.5 | 10.5 | |
| (b) HT supply contract demand ('CO | 0 | 5 | 5 | 5 | 0 | 4.5 | 5 | 5 | |
| (c) standby supply ? | 0 | 0 | 5 | 9 | 0 | 0 | 4.5 | 10 | |
| (d) overdrawal | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 1.5 | |
| (e) inadvtant supply to discom | 2 | 0 | 0 | 0 | 1.5 | 0 | 0 | 0 |