State of Tamilnadu - Section

Section 5 in The Central Electricity Regulatory Commission (Open Access in Inter-State Transmission) Regulations, 2004

5. Criteria for allowing transmission access.

- (i) The long-term access shall be allowed in accordance with the transmission planning criterion stipulated in the Grid Code;
(ii)The short-term access shall be allowed, if request can be accommodated by utilising:
(a)Inherent design margins;
(b)Margins available due to variation in power flows; and
(c)Margins available due to in-built spare transmission capacity created to cater to future load growth.