[Cites 0, Cited by 0]
[Entire Act]
Union of India - Section
Section 94 in The Dedicated Freight Corridor Railway General Rules, 2018
94. Bell coding for signalling of trains between stations.
| Sr. No. | Indication | How to acknowledge the signal | Number of beats | How signalled |
| 1 | Call attention or attend telephone | 0 | One | 0 |
| 2 | Is Line Clear or enquiry about Line Clear | 00 | Two | 00 |
| 3 | Train entering block section | 000 | Three | 000 |
| 4 | (a)Train out of block section | 00000 | Four | 0000 |
| (b) Obstruction removed | ||||
| 5 | (a) Cancel last signal | 00000 | Five | 00000 |
| 6 | Emergency danger signal. Attend block telephoneimmediately. | 000000 | Six | 000000 |
| 7 | Testing | 0000000000 | Ten | 0000000000 |