Section 7(1)(o) in Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010

(o)[ The participation factors, and the Point of Connection nodal and zonal rates thus determined, shall be computed for each Application Period. Detailed methodology for preparing the Base Case shall be in accordance with the methodology given in Annexure-I to these regulations. [Substituted by Notification No. L-1/44/2010-CERC, dated 1.4.2015 (w.e.f. 15.6.2010).]