Section 2(1)(o) in Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff determination of energy from Renewable Energy Sources) Regulations, 2017
(o)'Inadvertent Energy' means the power other than the contracted power and flows in the grid by displacement;