point of time.
He admitted that the compoundable deviations in any building can be
compounded at the time of completion. He stated that he does ... building where open space area was shown in the
copy of the building sanctioned plan. He also stated that the deviations
made in the form
building permit in the prescribed
procedure."
......................
"(ii) Deviation of the building Byelaws other than as
specified in (A)(NonCompoundable)
Deviation upto ... building and as to whether there was any deviation in the
building constructed and the sanction plan; Inspector Yashpal Singh
(PW10) visited the site alongwith
posted in Building Headquarters. He deposed that the duties
of the engineers posted in Building Department are to ensure the
building activities within the permissibility ... Engineers posted in Building Department are to ensure the building
activities within the permissible applicable norms. He further
deposed that building activities in a zone
carrying out unauthorized construction in the shape of basement
and deviation against sanction building plan file no.
ASHISH Digitally signed
FIR No:51/2016 ... carrying out
unauthorized construction in the shape of
basement and deviation against sanction building
plan file no. 115/A/HO/94, dt. 26.07.1994 without
permission
Satya Constructions
(b) Work : A/R El M/o Bld., TE Building, Tis Hazari.
(c) Result of physical inspection ... such work was
carried out at Tis Hazari TE Building. Test check certificates and the
deviation statement bears the signature of XEN RL Ghera
been converted from basement to
second floor i.e. deviation against sanctioned building plan.
8. The relevant record in respect of the property in question ... dated 20.12.1999 in the shape of deviation against
sanctioned building plan and unauthorized construction in set back. A show
cause notice was issued
raised till first floor and there was an excess coverage /
deviation against the sanctioned building plan. Upon noticing the
same, the show cause notice under ... still in the process
and there was coverage and deviation against the sanction
building plan. Consequently, the show cause notice under relevant
provision
variation
against sanctioned building plan. As per the witnesses, the said
premises was sealed as the building plan was deviated from Sanctioned
Plan. Hence ... which were allegedly made in
the said building. Without proving the sanction plan of the building, the
deviation, if any, in the said building cannot
this witness, the said premises was sealed as the
building plan was deviated from Sanctioned Plan. Hence, as per the
case of prosecution, building plan ... which were allegedly made in the said building. Without
proving the sanction plan of the building, the deviation, if any, in the said
building cannot
certificate or a completion
certificate is granted. Merely because a building has some deviations from
the sanctioned plan, either at the initial stage or later ... that to bring the construction in
conformity with the building regulations, a part of the building was
demolished by Sadananda Gowda and Jeevaraj. The stage