that HOJ-I refers to Haldia Oil Jetty - I and HOJ-II refers to Haldia Oil
Jetty - II respectively.
It was further observed that ... which was
plying close to the jetty-in-question at the relevant point of time. During
motion, the damage occurred; as such, prima facie there
suffer total
loss and / or any substantial damage during its journey from Mumbai to
Kathale Shipyard Jetty, Lavgan, Maharashtra and back and in the event ... Port
to Kathale Shipyard Jetty, Lavgan, Maharashtra and back if
the vessel encounters a total loss and / or any substantial
damage, the owners
Central Pollution Control Board ( CPC B)
Guidelines of 2013 provide for designed jetty and dedicated boats being
used for transportation of fly ash to avoid ... laden barge capsized after hitting a submerged
pontoon jetty that was damaged by the Cyclone Amphan in Hatania Doania
at Namkhana, South 24 Pargana
causing pollution and environmental
damage forthwith and further respondent No.1 be prohibited
from constructing any conveyer belt upto jetty and further
remove the entire ... jetty or constructing conveyor
belt leading to the destruction of mangroves.
(h) The adequate compensation may be determined for causing
environmental damage
application arises out of a damage caused to the twin marine loading
unloading arms installed at Haldia Oil Jetty No.1 (in short ... make the fluid cargo handling unit
operative once again.
The loss and damage alleged qualifies as a maritime claim under the
provisions of Section
case is that on 1.5.2010 at about
11.55 a.m. at Bunder Jetty, Diu, the Applicant navigated his
boat ... rash and negligent
manner. It dashed against two police boats causing damage
to both of them. The investigation was conducted and
3 of 6
::: Uploaded
public.
The site was close to the ferry ghat and the jetty and
frequented by many travellers.
The 'Sulav Toilet' is maintained ... Ramganga. The
toilet which had existed at the said site, had been
damaged and a new toilet was decided to be
constructed from the funds
direction be
issued to respondent No.6/Project Proponent to remedy the damage
caused by its activities.
2. In brief, the facts of this case ... tugs will be
strengthened to handle project cargo.
v). Mechanization of south jetty to handle coal cargo.
vi). Rail loading silo and other supporting infrastructure
that the loading of the Cargo was done in conditions at the jetty that led to high moisture content have not been contended with ... Policy schedule, the insurer cannot be held liable for any loss or damage to the insured cargo on account of the negligence or fault
contractors be prohibited from
any further construction of RO-RO Jetty in CRZ- IB area; pass an order
directing Respondent No. 2/Gujarat State Pollution ... Respondent No. 5/Central Pollution Control Board to compute the
'Environment damage compensation' for the violations of the environment
laws by the Respondent