such as construction of new line new buildings, new structures and new installations and reconstruction of existing lines, buildings, new structures and installations for both
payable by the applicant for providing new connection
- Involving erection of new 33 KV sub-station (S/S), lines etc. up to Contract Demand ... erection of new 33 KV line
- 75 days
- Involving erection of new EHT line
- 150 days
- Involving augmentation or addition of transformers
altered; (c) that the line of any public embankment should be changed or lengthened, or that a new public embankment should be constructed instead ... enlarged, repaired or removed, or that the line of any embankment be altered or that any new water-channel be made, or that any water
ready reckoner to show the per-unit material cost of LT line, HT line, substation of different capacities etc. The licensee may update the ready ... work of extension of EHT and HT line, distribution or HT substation and LT line through an 'A' class contractor as per the estimates
land, should be removed or altered; (3) Changing line of embankment. - that the line of any public embankment should be changed or lengthened, or that ... enlarged, repaired or removed, or that the line of any embankment be altered, or that any new water-course be made, or that any water
mutation on the rent roll must be fully explained. If a new tenancy has to be opened it must be given a number in continuation ... alluvion or diluvion a new map of the area should be prepared the old settlement lines being marked in distinct colours. 42. Amalgamation of holdings
Appendix B. 4.7 Implementation. - The actual programme of implementation of transmission lines, inter - connecting transformers, reactors/capacitors and other transmission elements will be determined ... prospective Users are treated in a non-discriminatory manner (ii) Any new or modified connection when established shall neither suffer unacceptable effects
point shall be line isolator on outgoing feeder on HV side of generator transformer; (i) 'MNRE' means the Ministry of New and Renewable Energy, Government ... Power technology based on either line focus or point focus principle as may be approved by the Ministry of New and Renewable Energy. (r) 'Tariff
areas specified below-
Area
Competent authority
1.
For the New Capital Area, Patna as specified in the schedule hereto annexed in respect of residences meant ... Schedule
Boundaries of the New Capital Area, Patna North- Villages Shekhpura, Sherulahpur, Dhakanpura, Mahauli, Dujra, Diara, Raipore, Hasanpore. South- Railway line and villages Yarpur Dhakanpura
previous notification to be Reserved Forest. Such changes require either a new settlement of the additions it is proposed to make, or, in the case ... should be planted on both sides of the pillar along the boundary line indicating the direction. (c) Cleared lines-A belt of land as prescribed