excavation, blasting,
sealing and mucking, utilized for mine development at Kayad captive
mines.
2. The appellant seeks the quashing of the order dated 25.05.2018
passed ... material/input, it had availed mining services and ancillary services at
the Kayad Mines, which operated as a captive mine for the appellant.
6. Three
Cement Ltd. vs. Commissioner of Central Excise, Hyderabad18 to
contend that captive mines are integral part of factory.
27. In Vikram Cement, the Supreme Court ... that
Modvat/CENVAT credit on capital goods, if the mines are captive mines
so that they constitute one integrated unit together with the concerned
cement
Cement Limited it was held that
the equipments used in the captive mines of the factory would be entitled to
Cenvat credit. In the case ... conveying fresh Lime stones from crusher
(located in/ near the captive mines) to the factory where cement is
manufactured.
2.7 The learned counsel further argued
captive coal block.
(b) When coal was being supplied in lieu of the captive coal block,
the question of considering captive coal block does ... alternate coal procured to overcome unavailability of
tapering linkage/MoU/captive mine coal. It is submitted that the Impugned
Order wrongly restricts the directions
under consideration for the unit of Mine and HO
where as same needs to be distributed between Mine & HO and
processing unit ... material, the
company is transferring granite slabs from its captive mines to
factory. While preparing the financial statements of mine as on
31.3.2007 the material
period ending 30.6.2019 for
the cement plant and for the Captive lime stone mine has valid consents under
Water (Prevention and Control of Pollution ... period ending 30.6.2021 for
the cement plant and for the captive lime stone mine has valid consents under
Water (Prevention and Control of Pollution
pakka
roads in the mining area, which accelerating the pollution. The
Respondent No. 1 is using paddy husk in its captive thermal
power plant ... been submitted by
Respondent No. 1 as on 18.9.2017.
14. the captive limestone mines of industry are 4-5 km
away from Satna city. Mines
Acit, Hisar vs Jindal Steel & Power Ltd., Hisar on 1 December, 2021
IN THE
Cements *
Limited and Coal
its Captive procured ... Coal
Captive TPP required 54,499 46,959 88,743 58,563 29,497 2,78,261
of Shyam *
Century Coal
procured
Acit, Hisar vs M/S Jindal Steel & Power Ltd., Hisar on 1 December, 2021