CERC" or "Central Commission" means the Central Electricity Regulatory Commission; (9) "Check Meter" means a meter, which shall be connected to the same core
Grid Interactive System based on Net Metering) Regulations, 2019" (hereinafter referred to as "Net Metering Regulations, 2019")
2. Definitions, Abbreviations and Interpretations ... which generating plant is synchronised with the grid system; (6) "Check Meter" means a meter, which shall be connected to the same core
Metering) Regulations, 2019" (hereinafter referred to as "Net Metering Regulations, 2019")
8. Metering Arrangement.
- 8.1. The metering system shall ... Solar Energy Meter shall have facility for recording meter readings using Meter Reading Instrument (MRI) or wireless equipment. 8.4 Check Meters shall be mandatory
Cross Border Trade of Electricity) Regulations, 2019
17. Metering Arrangements.
(1) Interface Meters (Main Meter, Check Meter and Standby Meter) shall be installed at both ... Agencies of both the countries shall confirm the availability of Main Meter, Check Meter and Standby Meter to System Operator of respective country. (3) Interface
Solar Energy Meter (a unidirectional meter) is to be installed as an integral part of the Net Metering system at the point at which ... Solar Energy Meter shall have facility for recording meter readings using Meter Reading Instrument (MRI) or wireless equipment. 8.4 Check Meters shall be mandatory
transmission system as required under Grid Code. 17. Metering Arrangements.
(1) Interface Meters (Main Meter, Check Meter and Standby Meter) shall be installed at both ... Agencies of both the countries shall confirm the availability of Main Meter, Check Meter and Standby Meter to System Operator of respective country. (3) Interface
CERC" or "Central Commission" means the Central Electricity Regulatory Commission; (9) "Check Meter" means a meter, which shall be connected to the same core
shall be vented vertically upwards to atmosphere at an elevation of 3 meter (minimum) from the platform for effective dispersion of hydrocarbons and in such ... flow meters for pipeline transfers shall be provided and the mass flow meters shall be certified for its use with LPG; vi. A check valve
meter has been extracted by the said user, until the contrary is proved. An annual ground water audit shall be conducted to check the actual
other purposes in the truck shall be protected by suitable excess flow check valves mounted in the openings of the vessel and openings of less ... frame of the vehicle against damage; iii. All piping, fittings, pumps and meters permanently mounted on the vehicle shall be designed to withstand the most