Hind Plastic C/O.Rauk Haji Abdul vs Deputy Engineer on 24 April, 2014

theft of electrical  energy is clearly established against  the appellant.  The connected load was found at 71 HP  at the time of checking ... that  connected  load  is   mentioned  in   the  checking  sheet  with  necessary  break­up   of   machines.   Now   the  appellant   contended   that   that  connected load taken
Gujarat High Court Cites 2 - Cited by 0 - R M Chhaya - Full Document

Khodiyar Ice Factory vs G.E.B. & on 18 March, 2014

visited the unit of  the   petitioner   on   09.09.2003   and   the  connected  load found  to be 80 H.P. That  by  application   dated   30.10.2003   the   petitioner ... installations  and upon undertaking such inspection it was  found   that   the   connected   load   is   151   HP,  whereas the contract load was only
Gujarat High Court Cites 1 - Cited by 0 - R M Chhaya - Full Document