Raipur. The respondents are engaged in the manufacture of Sponge Iron. Char/dolochar produced in the process are captively consumed for generation of electricity. Most ... deny exemption under notification no.67/95-CE dated 16.03.1995 for char/dolochar. The Original Authority vide his order dated 28.02.2005 dropped the demand
Notification No. 67/95 CE 06.03.1995 has been denied on the item Dolochar captively consumed by the appellant for production of electricity.
2. The appellant ... emerges, known as Char. This Char, when reacts with dolomite results in Dolochar.
iii. Part of Char/Dolochar is used by the appellant in their
excise
duty is being paid. In the course of said manufacture, 'dolochar' (also
known as 'coal char') is produced which ... course of adjudication, the Ld.
Addl. Commissioner while taking a view that dolochar is not classifiable
under the aforesaid chapter heading, dropped the demand proposed
generated which is nothing but „waste‟ which is also known as „Dolochar‟
in the trade and it has no primary use.
2.3 The „Dolochar‟ generated ... market.
2.4 During the period 2014-15 they sold 32432.760 MT of „Dolochar‟
at the value of Rs.27,91,966/- @ Rs.86/- per Metric
thereby use in the boiler as fuel
reducing the fertility as the Dolochar (Waste)
of soil. Also during is having good calorific
summer and winter ... generated.
X The charcoal heaps Most of the dolochars
are adversely are sold to Power plants
impacting the to be used in ABC
environment. During
products of
coal and asserts expertise in handling coal derivatives
including dolochar and similar materials.
3. The respondent No.2 manages Bellary Thermal
Power Station ... came to
be disqualified on the ground that its experience in
handling dolochar does not qualify as experience in "waste
coal".
5. Thereafter
plant area has not been provided.
12. Old solid wastes (dolochar) dumps were observed inside
plant premises at 5 places. Out of which 04 dumps ... dust
emission during windblown. It was observed that industry
has started dispatching dolochar.
13. Dump of residual iron ore fines outside the plant premises
plant area has not been provided.
12. Old solid wastes (dolochar) dumps were observed inside
plant premises at 5 places. Out of which 04 dumps ... dust
emission during windblown. It was observed that industry
has started dispatching dolochar.
13. Dump of residual iron ore fines outside the plant premises
plant area has not been provided.
12. Old solid wastes (dolochar) dumps were observed inside
plant premises at 5 places. Out of which 04 dumps ... dust
emission during windblown. It was observed that industry
has started dispatching dolochar.
13. Dump of residual iron ore fines outside the plant premises
clandestine removal of finished goods, i.e.
sponge iron, steel ingots, runners, dolochar & char manufactured,
without payment of duty of excise ... Item Qty (M.T.) Period
Sponge iron 20516 01.04.09 to 07.07.11
Dolochar 19959 01.04.09 to 07.07.11
Steel Ingots 8951 01.04.2010 to
07.07.2011
Risers & Steel