appellant.
3. Then a development took place. The Gujarat Electricity Transmission
Company (GETCO) who is the respondent No. 3 in this Appeal informed
the appellant ... transmission facility for evacuation of power the appellant was to
coordinate with GETCO and finalize the evacuation arrangement including
the appropriate sub-station
Gandhinagar - 382017 (Gujarat)
.... Respondent No.3
4. Gujarat Energy Transmission
Corporation Ltd. (GETCO)
Page ... State of Gujarat.
iii. Gujarat Energy Transmission Corporation Ltd. ("GETCO") is
the Transmission Licensee in the State of Gujarat. It is also
Page
Generator), to deal with the Gujarat Energy
Transmission Corporation Limited (GETCO) and
other agencies in regard to timely establishment of
evacuation facilities for conveyance ... from the switch yard of the Generator to the
substation of the GETCO and the cost of the same
will be borne by GETCO
contributed, the same being utilized in
creation of the fixed assets without GETCO being entitled to any return
on investment or interest actually or notionally ... deferred income and
correspondingly no depreciation need to be paid to GETCO. The State
Commission ought not to have considered the deferred income
Anushka Arora for R-1
Mr. Ishan Mukherjee
Ms. Venu for GETCO
Ms. Swapna Srivastava
Ms. Nishtha Sikroria
Ms. Poorva Saigal
Appeal ... Gujarat
Urja Vikas Nigam Ltd. (GUVNL) and Gujarat Energy Transmission
Corporation Ltd., (GETCO), under Section 111 of the Electricity Act, 2003
against the Order dated
Mundra-Versana-Hadala D/C transmission lines of
GETCO.
Page 6 of 56
Appeal No. 185 of 2011
4. The respondent ... dated
24.6.2011 to the effect that since the actual power flow on
GETCO's system was high on account of system dynamics any
further
obligation of construction of the evacuation
facilities on the licensees, namely, GETCO/DISCOM (transmission or distribution licensee).
The State Commission has further held that ... renewable energy sources) the
State Commission (GERC) had directed GETCO for laying down the transmission line at its
own cost, as noted below
delivery point in
the plant switch yard to the sub-station of GETCO was to be constructed
at the cost of the appellant. The construction ... work commenced on
24.11.2007 and subsequently GETCO after conducting a system study
for evacuation of the power informed the Appellant that power could no
longer
Ashram Road, Ahmedabad‐ 380 009
2. Gujrat Energy Transmission Co. Ltd. (GETCO)
Race Course, Vidyut Bhawan, Vadodara 390 007.
3. Uttar Gujrat Vij Company Limited ... clearly indicate that end use could be at more
than one location. GETCO (R‐2) assumed that in the absence of specific
provision, earlier provision
claimed by the Respondent no.1 Gujarat Energy
Transmission Corporation Ltd. ("GETCO") for the captive power
plant (generating unit) for sugar refinery (consuming ... same time have the
connectivity with the Grid operated and maintained by GETCO. By
the impugned order dated 08.08.2013 in Petition