Section 5 in Madhya Pradesh Electricity Grid Code (Revision-II), 2019 [Entire Act]
protection requirements as specified in the Metering and Protection sections of the Code. 5.6.4 SSGS & IPP (except CPPs) shall make available to SLDC ... similarly furnish the net reactive capability that will be available for Export to/Import from State Transmission System. The State Transmission System rated frequency shall