including unclaimed or confiscated or unserviceable or scrap surplus, old or obsolete goods or discarded material or waste products whether by auction or otherwise directly ... goods as unclaimed or confiscated or unserviceable or scrap surplus, old, obsolete or discarded materials or waste products, by the persons or bodies referred
particles usually present in the roof-tops of the buildings. Suitable filter material such as well-burnt broken bricks or coarse sand or small sized ... metal gravels (baby chips) shall be used in the filter chamber. The surplus water-available after filling the storage tank/ sump shall be diverted
Tamil Nadu Slum Areas (Improvement and Clearance) Act, 1971
TAMILNADU
India
Tamil Nadu Slum Areas
ground, shall be made. This pit shall be filled with suitable filter materials such as well-burnt broken bricks (or pebbles) up to 15 centimetres ... covered with perforated reinforced concrete cement (RCC) slabs or of any other material, wherever considered necessary. The number of such percolation pits shall be provided
ground, shall be made. This pit shall be filled with suitable filter material such as well-burnt broken bricks (or pebbles) up to 15 centimetres ... covered with perforated reinforced concrete cement (RCC) slab or of any other material, wherever considered necessary. The number of such percolation pits shall be provided
ground shall be made. The pit shall be filled with suitable filter material such as well-burnt broken bricks (or pebbles) up to 15 centimetres ... covered with perforated reinforced concrete cement (RCC) slab or of any other material, wherever considered necessary. The number of such percolation pits shall be provided
ground, shall be made. This pit shall be filled with suitable filter material such as well-burnt broken bricks (or pebbles) up to 15 centimetres ... covered with perforated reinforced concrete cement (RCC) slab or of any other material, wherever considered necessary. The number of such percolation pits shall be provided
been deposited in banks and surplus funds have been invested. (5) The auditor shall also report any material impropriety or irregularity which he may observe
ground, shall be made. This pit shall be filled with suitable filter material such as well-burnt broken bricks (or pebbles) up to 15 centimetres ... covered with perforated reinforced concrete cement (RCC) slab or of any other material, wherever considered necessary. The number of such percolation pits shall be provided
shall satisfy himself as to the degree of certainty of the demand materializing. (ii) The STU shall work out on the basis of projected loads ... peak load requirement at generation end. The installed capacity, peak availability, surplus and deficit both in demand and energy shall also be worked