Search Results Page

Search Results

1 - 10 of 65 (0.01 seconds)

The Legal Metrology (General) Rules, 2011

laid down in Part I of First Schedule. (2) The maximum permissible error in respect of any reference standard weight, on verification or re-verification ... laid down in Part II of First Schedule. (4) The maximum permissible error in respect of any reference standard metre bar, on verification
Union of India - Act Cites 0 - Cited by 3

The Packaged Commodities (Regulation) Order, 1975

commodity produced, made or manufactured, by him or it; (k) "maximum permissible error" in relation to the quantity contained in an individual package, means ... packages, it shall be deemed to be within the maximum permissible error. (5) If, as a result of the tests aforesaid, it is found that
Union of India - Act Cites 0 - Cited by 4

The Legal Metrology (Packaged Commodities) Rules, 2011

such person or firm as the case may be; (e) "Maximum permissible error", in relation to the quantity contained in an individual package, means ... packages that show an error in deficiency exceeding the maximum permissible error is greater than that shown in column 4 of Table under Fifth Schedule
Union of India - Act Cites 0 - Cited by 2

The Standards of Weights and Measures (General) Rules, 1987

down in Part I of the First Schedule. (2) The maximum permissible error in respect of any reference standard weight, on verification or re-verification ... down in Part II of the First Schedule. (4) The maximum permissible error in respect of any reference standard metre bar, on verification
Union of India - Act Cites 0 - Cited by 0

The Energy Conservation (Energy Consumption Norms and Standards for Designated Consumers, Form, Time within which, and Manner of Preparation and Implementation of Scheme, Procedure for issue or purchase of Energy Saving Certificate and Value of Per Metric Tonne of Oil Equivalent of Energy Consumed) Rules, 2012

that errors, omissions or misrepresentations or aggregation by way of errors, and sums thereof shall not exceed ±0.5 percent. which shall be the permissible error
Union of India - Act Cites 0 - Cited by 0

Joint Electricity Regulatory Commission for the UT of Jammu & Kashmir and the UT of Ladakh (Grant of Connectivity and Open Access in Intra-State Transmission & Distribution and related matters) Regulations, 2024

Regulations: Provided that the Nodal Agency shall inform the Applicant of any errors or missing information within two (2) Working Days of the receipt ... application for Open Access, the Nodal Agency shall obtain all the permissions and clearances from the Distribution Licensees, SLDC, STU and other agencies
Union of India - Act Cites 0 - Cited by 0
1   2 3 4 5 6 7 Next