right or interest either in whole or in part in any parking lot
or toll plaza or mine or quarry, to another person, other than ... corresponding entry in column (3) of the said Table, of
such amount as income-tax:
TABLE
Sl.
Nature of contract or licence or lease
Today on 19.9.2007 during the course of survey in the Model
Town Park, we have seen the loose papers filed ... found from hand bag which was kept near the table and as per
data entered into these pages and as per evolution of facts therefrom
Gazette dated 18.11.2009 under
Air (Prevention and Control of Pollution) Act, 1981 .
Table 6: Stack air quality monitoring results
Sr. Name of the Plant ... below;
Table 7: Details of green belt area
Sr. Description of Area Length Width Area (sq.
No. (M) (M) M)
1. Atal Park
Gazette dated 18.11.2009 under
Air (Prevention and Control of Pollution) Act, 1981 .
Table 6: Stack air quality monitoring results
Sr. Name of the Plant ... below;
Table 7: Details of green belt area
Sr. Description of Area Length Width Area (sq.
No. (M) (M) M)
1. Atal Park
Gazette dated 18.11.2009 under
Air (Prevention and Control of Pollution) Act, 1981 .
Table 6: Stack air quality monitoring results
Sr. Name of the Plant ... below;
Table 7: Details of green belt area
Sr. Description of Area Length Width Area (sq.
No. (M) (M) M)
1. Atal Park
ramp, showroom, railway siding, Lorry parking yard work
factory buildings, residential quarters for Industrial workers
as shown in the Table below.
Sl. No. Recipients
following table:
Date Value
29/1/2001 Purchase of ½ undivided share in Plot No. 160, Indira Colony, Bani 3,50,000
park, Jaipur jointly with
conducted on 20-06-2014 at several
offices and the car parking area of the BDA Central
Office premises by the Investigating Officer ... table rack and he made a bare denial of that he had
no knowledge about such an amount being kept in
his office table
indicated in table 1
below:
6 ST/89404/2014
Sno Name Status Amount
1 M/s Tril Info Park Ltd SEZ Unit ... site as "TRIL
Park Tarmani" whereas the accompanying log
sheets show the site as "Tril Info Park
conducted on 20-06-
2014 at several offices and the car parking area of the
BDA Head Office premises by the Investigating Officer ... table. An
amount of Rs. 50,000/- was recovered from the posses-
sion of A3 while he was sitting in his car at the parking