Search Results Page

Search Results

1 - 10 of 233 (0.74 seconds)

Smt. Raminder Kaur vs Sandeep Khullar on 29 August, 2013

Geyser provisions are given on top floor terrace under sloping roof projections. Water tank has been provided and everything was done as per the drawings ... palace. There is a hydraulic lift, centrally air-conditioned, heat insulation underneath roof and above POP false ceiling 24 hour genset back-up with servo
State Consumer Disputes Redressal Commission Cites 4 - Cited by 0 - Full Document

Punjab Urban Planning and Development Authority Building Rules, 2013

gutter; and (v) electric meter, generator room with temporary roof, guard room. (zt) "stand alone project" means any project which is independent with regard ... amended from time to time. 26. Set back of projected portion of roof level. - The projected portion of parapet, flues, ducts, water storage tanks, mumties
State of Punjab - Act Cites 0 - Cited by 0
1   2 3 4 5 6 7 8 9 10 Next